DAR File No. 27455 |
|
| This filing was published in the 10/15/2004, issue, Vol. 2004, No. 20, of the Utah State Bulletin. | |
| [ 10/15/2004 Bulletin Table of Contents / Bulletin Page ] | |
|
Natural Resources, Oil, Gas and Mining; Non-Coal R647-2 Exploration
|
|
NOTICE OF PROPOSED RULE |
|
|
DAR File No.: 27455
|
|
RULE ANALYSIS |
|
Purpose of the rule or reason for the change: |
|
|
The purpose of this rule change is to establish the procedural requirements for bonding exploration operations granted by S.B. 65, from the 2003 Legislature. (DAR NOTE: S.B. 65 is found at UT L 2003 Ch 35, and was effective 05/05/2003.)
|
|
Summary of the rule or change: |
|
|
This rule change tells how bonds for the reclamation of exploration operations are to be estimated, submitted to the division, reviewed, changed, and forfeited.
|
|
State statutory or constitutional authorization for this rule: |
|
|
Section 40-8-1 et seq.
|
|
Anticipated cost or savings to: |
|
the state budget: |
|
|
There may be an insignificant increase in administrative costs to the state budget. This would occur initially but as operators comply with the bonding requirements it will prevent future mine closures without bonds and thus prevent future costs to the state.
|
|
local governments: |
|
|
Since local government rarely engages in mining operations, there will be little or no impact on these governmental entities.
|
|
other persons: |
|
|
Other persons, such as bond issuing companies, may gain profit from issuing additional bonds to mining companies.
|
|
Compliance costs for affected persons: |
|
|
Compliance cost increases to mining companies may be experienced because of the additional bonding requirements. The actual costs are approximately 1% of the amount of the reclamation cost estimate.
|
|
Comments by the department head on the fiscal impact the rule may have on businesses: |
|
|
While these rule changes could impose a financial burden on business, they provide a "safety net" that assures that the state is not left with unreclaimed mined lands.
|
|
The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at: |
|
|
Natural Resources Oil, Gas and Mining; Non-Coal 1594 W NORTH TEMPLE SALT LAKE CITY UT 84116-3154
|
|
Direct questions regarding this rule to: |
|
|
Ron Daniels at the above address, by phone at 801-538-5316, by FAX at 801-359-3940, or by Internet E-mail at rondaniels@utah.gov
|
|
Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on: |
|
|
11/16/2004
|
|
Interested persons may attend a public hearing regarding this rule: |
|
|
10/27/2004 at 10:00 AM, Natural Resources Bldg, 1594 W North Temple, Suite 1050, Salt Lake City, UT
|
|
This rule may become effective on: |
|
|
11/17/2004
|
|
Authorized by: |
|
|
Ron Daniels, Coordinator of Minerals Research
|
|
RULE TEXT |
|
|
R647. Natural Resources; Oil, Gas and Mining; Non-Coal. R647-2. Exploration. R647-2-101. Filing Requirements and Review Procedures. 1. A complete
Notice of Intention to Conduct Exploration (FORM MR-EXP) or [ 2. Within 15 days
after receipt of a Notice of Intention to Conduct Exploration (FORM MR-EXP) or
comparable application[ 2.11. [ 2.12. [
3. If more
than five acres of disturbance are planned, then a detailed exploration
development and reclamation plan must be included in the notice of intention
and approved by the Division.[ 4. The Division will review and approve or disapprove: 4.11. The form and amount of reclamation surety, and; 4.12. Any variances requested under R647-2-107, 108, or 109,
regardless of the number of surface acres of disturbance planned.[ 5. Developmental
drilling conducted within [ 6. A permittee's retention of a notice of intention shall require the paying of permit fees as authorized by the Utah Legislature. The procedures for paying the permit fees are as follows: 6.11. The Division shall notify the operators of record annually of the amount of permit fees authorized by the Utah Legislature for Exploration. 6.12. Fees are due beginning July 31, 1998 and thereafter annually, by the last Friday of July as authorized by the Utah Legislature. 6.13. A permittee may avoid payment of the fee by complying with the following requirements: 6.13.11. A permittee will notify the Division of a desire to close out a notice of intention by checking the appropriate box of the permit fees billing form. 6.13.12. The permittee will then arrange with the Division for an onsite inspection of the site to assure that all required reclamation has been performed. If an inspection reveals that an area is not yet suitably reclaimed, then a new billing notice will be issued and the permittee will be given 30 days from the date of the onsite inspection to pay the fee. 6.14. All permit fees which remain uncollected 30 days after the due date will be turned over to the Utah Office of Debt Collection.
R647-2-102. Duration of the Notice of Intention. 1. A
complete Notice of Intention to Conduct Exploration or comparable [ 2. The Division will review and approve the extension and require or adjust the amount of reclamation surety. 3.
Failure by the operator to pay permit fees required by [
R647-2-104. Operator(s), Surface and Mineral Owner(s). The notice of intention shall include the following general information: 1. The name, permanent mailing address, and telephone number of the operator responsible for exploration. 2. The name and permanent mailing address of the surface land owner(s) and mineral owner(s) of all land to be affected by the operations. 3. The federal mining claim number(s), lease number(s), or permit number(s) of any mining claims, federal or state leases or permits included in the land affected. 4. A statement that the operator will conduct reclamation as required by these rules.
R647-2-105. Maps and Drawings. [ 1. The general location map shall be a USGS 7.5-minute series map or equivalent (1"=2000') and identify new or existing access roads. 2. The operations map (1"=200') shall identify: 2.11. The area to be disturbed; 2.12. The location of any existing or proposed operations including access roads, drill holes, trenches, pits, shafts, cuts, or other planned exploration activities; and 2.13. Any adjacent previous disturbance for which the operator is not responsible.
R647-2-106. Project Description. The notice of intention should include the following information: 1. A statement giving general details of the type or method of exploration proposed, including the proposed dates during which exploration will be conducted; 2. The type of minerals to be explored for; 3. The general dimensions of all drill holes, including total depth and diameter; 4. The general dimensions of all trenches, pits, shafts, cuts, or other types of disturbances; 5. The width and length of any new roads constructed; 6. An estimate of the total number of surface acres to be disturbed. 7. The amount of material (including mineral deposit, topsoil, subsoil, overburden, waste rock, or core hole material) extracted, moved, or proposed to be moved during the exploration operation.
R647-2-109. Reclamation Practices. The operator shall conform to the following practices while conducting reclamation unless the Division grants a variance in writing: 1. Public Safety and Welfare - The operator shall minimize hazards to the public safety and welfare following completion of operations. Methods to minimize hazards shall include but not be limited to: 1.11. The permanent sealing of shafts and tunnels; 1.12. Appropriate disposal of trash, scrap metal and wood, buildings, extraneous debris, and other materials incident to mining; 1.13. The plugging of drill, core, or other exploratory holes as set forth in Rule R647-2-108; 1.14. The posting of appropriate warning signs in locations where public access to operations is readily available; 1.15. The construction of berms, fences and/or barriers above highwalls or other excavations when required by the Division. 2. Drainages - If natural channels have been affected by exploration, then reclamation must be performed such that the channels will be left in a stable condition with respect to actual and reasonably expected water flow so as to avoid or minimize future damage to the hydrologic system. 3. Erosion Control - Reclamation shall be conducted in a manner such that sediment from disturbed areas is adequately controlled. The degree of erosion control shall be appropriate for the site-specific and regional conditions of topography, soil, drainage, water quality or other characteristics. 4. Deleterious Materials - All deleterious or potentially deleterious material shall be safely removed from the site or left in an isolated or neutralized condition such that adverse environmental effects are eliminated or controlled. 5. Land Use - The operator shall leave the on-site area in a condition which is capable of supporting the postmining land use. 6. Slopes - Waste piles, spoil piles and fills shall be regraded to a stable configuration and shall be sloped to minimize safety hazards and erosion while providing for successful revegetation. 7. Highwalls - In surface mining and in open cuts for pads or roadways, highwalls shall be reclaimed and stabilized by backfilling against them or by cutting the wall back to achieve a slope angle of 45 degrees or less. 8. Roads and Pads - On-site roads and pads shall be reclaimed when they are no longer needed for operations. When a road or pad is to be turned over to the property owner or managing agency for continuing use, the operator shall turn over the property with adequate surface drainage structures and in a condition suitable for continued use. 9. Dams and Impoundments - Water impounding structures shall be reclaimed so as to be self-draining and mechanically stable unless shown to have sound hydrologic design and to be beneficial to the postmining land use. 10. Trenches and Pits - Trenches and small pits shall be reclaimed. 11. Structures and Equipment - Structures, rail lines, utility connections, equipment, and debris shall be buried or removed. 12. Topsoil Redistribution - After final grading, soil materials shall be redistributed on a stable surface so as to minimize erosion, prevent undue compaction and promote revegetation. 13. Revegetation - The species seeded shall include adaptable perennial species that will grow on the site, provide basic soil and watershed protection, and support the postmining land use. Revegetation shall be considered accomplished when: 13.11. The revegetation has achieved 70 percent of the premining vegetative ground cover. If the premining vegetative ground cover is unknown, the ground cover of an adjacent undisturbed area that is representative of the premining ground cover will be used as a standard. Also, the vegetation has survived three growing seasons following the last seeding, fertilization or irrigation, unless such practices are to continue as part of the postmining land use; or 13.12. [ 14.
[
R647-2-111. Surety. 1. [ 1.11 Existing exploration operations will not be extended after the effective date of R647-2-111 unless reclamation surety has been posted with the Division as required by this section. 1.12 Failure to furnish and maintain reclamation surety will suspend an operator's authorization to conduct exploration operations and may, after opportunity for notice and hearing, result in a withdrawal of the approved notice of intention as provided for in Section 40-8-16(2) and (3). 2. The Division
will not require a separate surety where a reclamation surety in a form and
amount acceptable to the Division is held by [ 3. As part of the review of the notice of intention, the Division shall determine the required surety amount based on: 3.11. [ 3.12. The Minerals Regulatory Program's average dollars per acre reclamation costs, if comparable to site specific cost estimates for similar operations; and 3.13. An operator's reclamation estimate [ 4. The operator
shall submit a completed Reclamation Contract (FORM MR-RC) with the required
surety. The form and amount of [ 4.11. A corporate surety bond from a surety company that is licensed to do business in Utah, that is listed in "A.M. Best's Key Rating Guide" at a rating of A- or better or a Financial Performance Rating (FPR) of 8 or better, according to the "A.M. Best's Guide". All surety companies also will be continuously listed in the current issue of the U.S. Department of the Treasury Circular 570. Operators who do not have a surety bond with a company that meets the standards of subsection 4.11 will have 120 days from the date of Division notification after enactment of the changes to subsection 4.11 to achieve compliance or face enforcement action. When the Division in the course of examining surety bonds, notifies an operator that a surety company guaranteeing its performance does not meet the standards of subsection 4.11., the operator has 120 days after notice from the Division by mail to correct the deficiency, or face enforcement action; 4.12. Federally-insured certificate of deposit payable to the State of Utah, Division of Oil, Gas and Mining; 4.13. Cash; 4.14. An irrevocable letter of credit issued by a bank organized to do business in the United States; 4.15. Escrow accounts. 4.16. In addition, the Board may accept a written self-bonding agreement in the case of operators showing sufficient financial strength. 5. Surety shall be required until such time as reclamation is deemed complete by the Division. The Division shall promptly conduct an inspection when notified by the operator that reclamation is complete. The full release of surety shall be evidence that the operator has reclaimed as required by the Act. 5.11. A partial release of surety can be made by the Division if it determines that a substantial phase or segment of reclamation such as demolition, backfilling or regrading has been successfully performed and the residual amount of retained surety is sufficient to insure completion. [ ] R647-2-112. Failure to Reclaim. If the operator fails or refuses to conduct reclamation as outlined in the complete notice of intention, and comply with the requirements of R647-2-107, R647-2-108, or R647-2-109the Board may, after notice and hearing, order that: 1. [ [ [ 3.11 The forfeited surety shall be used only for the reclamation of lands incident to the mining operation, and any residual amount returned.
R647-2-113. Confidential Information. Information provided in the notice of intention and in the Mineral Exploration Progress Report (FORM MR-EPR) that relates to the location, size, and nature of the mineral deposit, shall be protected as confidential information by the Board and the Division. The information will not be a matter of public record until a written release is received from the operator.
R647-2-114. Revised Notice. Minor additions or changes in the location of exploration
operations do not require the submittal of a revised notice of intention. A new or revised Notice of Intention to
Conduct Exploration (FORM MR-EXP) or comparable [ 1. The proposed
additions or changes will occur outside the originally designated [ 2. The proposed
additions will [ 2.11. Substantially increase the environmental impacts when compared with the existing impacts as determined by the Division; or 2.12. A request for a variance is made under R647-2-110; or 2.13. A 25 percent increase or decrease in the amount of reclamation surety; or 2.14. A 50 percent increase or decrease in the size of the disturbed area as described in the current notice of intention; or 2.15. As required by R647-2-101.3
R647-2-115. Reports. On or before December 31st of the year of
filing of a Notice of Intention to Conduct Exploration (FORM MR-EXP) or
comparable [
R647-2-116. Practices and Procedures; Appeals. The Administrative Procedures, as outlined in R647-5, shall be applicable to minerals regulatory proceedings.
KEY: minerals reclamation [ Notice of Continuation July 8, 2003 40-8-1 et seq.
|
|
ADDITIONAL INFORMATION |
|
|
PLEASE NOTE:
|
|
|
For questions regarding the content or application of this rule, please contact Ron Daniels at the above address, by phone at 801-538-5316, by FAX at 801-359-3940, or by Internet E-mail at rondaniels@utah.gov For questions about the rulemaking process, please contact the Division of Administrative Rules (801-538-3764). Please Note: The Division of Administrative Rules is NOT able to answer questions about the content or application of these administrative rules. |
|
| [ 10/15/2004 Bulletin Table of Contents / Bulletin Page ] | |
| Last modified: 10/14/2004 6:08 PM | |