Natural Resources, Oil, Gas and Mining; Non-Coal R647-3 Small Mining Operations
|
|
NOTICE OF PROPOSED RULE |
|
|
DAR File No.: 28339
|
|
RULE ANALYSIS |
|
Purpose of the rule or reason for the change: |
|
|
The purpose of this rule change is to establish the procedural requirements for bonding small (less than five acre) mining operations as granted by S.B. 65 from the 2003 Legislature. (DAR NOTE: S.B. 65 (2003) is found at UT L 2003 Ch 35, and was effective 05/05/2003.)
|
|
Summary of the rule or change: |
|
|
This rule change tells how bonds for the reclamation of small mining operations are to be estimated, submitted to the division, reviewed, changed, and forfeited.
|
|
State statutory or constitutional authorization for this rule: |
|
|
Section 40-8-1 et seq.
|
|
Anticipated cost or savings to: |
|
the state budget: |
|
|
There may be an insignificant increase in administrative costs to the state budget. This would occur initially but as operators comply with the bonding requirements it will prevent future mine closures without bonds and thus prevent future costs to the state.
|
|
local governments: |
|
|
Since local government rarely engages in mining operations, there will be little or no impact on these governmental entities.
|
|
other persons: |
|
|
Other persons, such as bond issuing companies, may gain profit from issuing additional bonds to mining companies.
|
|
Compliance costs for affected persons: |
|
|
Compliance cost increases to mining companies may be experienced because of the additional bonding requirements. The actual costs are approximately 1% of the amount of the reclamation cost estimate.
|
|
Comments by the department head on the fiscal impact the rule may have on businesses: |
|
|
While this rule change could impose a financial burden on business, it provides a "safety net" that assures that the state is not left with unreclaimed mined lands. Michael R. Styler, Executive Director
|
|
The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at: |
|
|
Natural Resources Oil, Gas and Mining; Non-Coal 1594 W NORTH TEMPLE SALT LAKE CITY UT 84116-3154
|
|
Direct questions regarding this rule to: |
|
|
Ron Daniels at the above address, by phone at 801-538-5316, by FAX at 801-359-3940, or by Internet E-mail at rondaniels@utah.gov
|
|
Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on: |
|
|
01/25/2006
|
|
Interested persons may attend a public hearing regarding this rule: |
|
|
12/07/2005 at 10:00 AM, Natural Resources Bldg, 1594 W North Temple, Suite 1050, Salt Lake City, UT and 1/25/2006 at 10:00 AM, Natural Resources Bldg, 1594 W North Temple, Suite 1050, Salt Lake City, UT
|
|
This rule may become effective on: |
|
|
01/26/2006
|
|
Authorized by: |
|
|
Ron Daniels, Coordinator of Minerals Research
|
|
RULE TEXT |
|
|
R647. Natural Resources; Oil, Gas and Mining; Non-Coal. R647-3. Small Mining Operations. R647-3-101. Filing Requirements and Review Procedures. 1. Prior to
commencement of operations, a[ 2. Within 15 days after receipt of a Notice of Intention, the Division will review the proposal and notify the operator in writing; 2.11. [ 2.12. [ 2.12.111.[ [ 3.11. The form and amount of reclamation surety (R647-3-111), and 3.12. All variances requested from Rules R647-3-107, 108, and 109, regardless of the number of surface acres of disturbance planned. [
[ [ [ [ [ [ [
R647-3-102. Duration of the Notice of Intention. The notice of intention, including any subsequent
amendments or revisions, shall remain in effect for the life of the small
mining operation. However, the
notice of intention may be withdrawn, after notice and opportunity for Board
hearing, in the event of failure by the operator to pay permit fees
required by R647-3-101[
R647-3-104. Operator(s), Surface and Mineral Owner(s). The notice of intention shall include the following general information: 1. The name, permanent mailing address, and telephone number of the operator responsible for the small mining operation and reclamation of the site. 2. The name, and permanent mailing address of the surface landowner(s) and mineral owner(s) of all land to be affected by the mining operation. 3. The federal mining claim number(s), lease number(s) or permit number(s) of all mining claims, federal or state leases or permits included in the land affected. 4. A statement that the operator will conduct reclamation as required by these rules.
R647-3-105. Project Location and Map. [ 1. The general location map shall be the scale of a USGS 7.5 minute series map or equivalent (1"=2000') and identify new or existing access roads. 2. The operations map (1"=200' or other scale as determined necessary by the Division) shall identify: 2.11. The area to be disturbed; 2.12. The location of any existing or proposed operations including access roads, drill holes, trenches, pits, shafts, cuts, or other planned exploration activities; and 2.13. Any adjacent previous disturbance for which the operator is not responsible.
R647-3-106. Operation Plan. The operator shall provide a brief narrative description of the proposed mining operation as part of the notice of intention. The description should include the following information: 1. A statement giving general details of the type or method of mining operations proposed, and the type of minerals to be mined; 2. Estimated width and length of any new roads to be constructed; 3. An estimate of the total number of surface acres to be disturbed by the mining operation. 4. The amount of material (including mineral deposit, topsoil, subsoil, overburden, waste rock, or core hole material) to be extracted, moved, or proposed to be moved, relating to the mining operation.
R647-3-109. Reclamation Practices. During reclamation, the operator shall conform to the following practices unless the Division grants a variance in writing: 1. Public Safety and Welfare - The operator shall minimize hazards to the public safety and welfare following completion of operations. Methods to minimize hazards shall include but not be limited to: 1.11. The permanent sealing of shafts and tunnels; 1.12. The disposal of trash, scrap metal and wood, buildings, extraneous debris, and other materials incident to mining; 1.13. The plugging of drill, core, or other exploratory holes as set forth in Rule R647-3-108; 1.14. The posting of appropriate warning signs in locations where public access to operations is readily available; 1.15. The construction of berms, fences and/or barriers above highwalls or other excavations when required by the Division. 2. Drainages - If natural channels have been affected by mining operations, then reclamation must be performed such that the channels will be left in a stable condition with respect to actual and reasonably expected water flow so as to avoid or minimize future damage to the hydrologic system. 3. Erosion Control - Reclamation shall be conducted in a manner such that sediment from disturbed areas is adequately controlled. The degree of erosion control shall be appropriate for the site-specific and regional conditions of topography, soil, drainage, water quality or other characteristics. 4. Deleterious Materials - All deleterious or potentially deleterious material shall be safely removed from the site or left in an isolated or neutralized condition such that adverse environmental effects are eliminated or controlled. 5. Land Use - The operator shall leave the on-site area in a condition which is capable of supporting the postmining land use. 6. Slopes - Waste piles, spoil piles and fills shall be regraded to a stable configuration and shall be sloped to minimize safety hazards and erosion while providing for successful revegetation. 7. Highwalls - In surface mining and in open cuts for pads or roadways, highwalls shall be reclaimed and stabilized by backfilling against them or by cutting the wall back to achieve a slope angle of 45 degrees or less. 8. Roads and Pads - On-site roads and pads shall be reclaimed when they are no longer needed for operations. When a road or pad is to be turned over to the property owner or managing agency for continuing use, the operator shall turn over the property with adequate surface drainage structures and in a condition suitable for continued use. 9. Dams and Impoundments - Water impounding structures shall be reclaimed so as to be self-draining and mechanically stable unless shown to have sound hydrologic design and to be beneficial to the postmining land use. 10. Trenches and Pits - Trenches and small pits shall be reclaimed. 11. Structures and Equipment - Structures, rail lines, utility connections, equipment, and debris shall be buried or removed. 12. Topsoil Redistribution - After final grading, soil materials shall be redistributed on a stable surface, so as to minimize erosion, prevent undue compaction and promote revegetation. 13. Revegetation - The species seeded shall include adaptable perennial species that will grow on the site, provide basic soil and watershed protection, and support the postmining land use. Revegetation shall be considered accomplished when: 13.11. The revegetation has achieved 70 percent of the premining vegetative ground cover. If the premining vegetative ground cover of the disturbed area is unknown, then the ground cover of an adjacent undisturbed area that is representative of the premining conditions will be used as a standard. Also, the vegetation has survived three growing seasons following the last seeding, fertilization or irrigation, unless such practices are to continue as part of the postmining land use; or 13.12. The
Division determines that the revegetation work has been satisfactorily
completed within practical limits[ 14.
[
R647-3-110. Variance. 1. The operator may request a variance from Rule R647-3-107, 108, or 109 by submitting the following information which shall be considered by the Division on a site-specific basis: 1.11. The rule(s) as to where a variance is requested; 1.12. The variance requested and a description of the area that would be affected by the variance; 1.13. Justification for the variance; 1.14. Alternate methods or measures to be utilized. 2. A variance shall be granted if the alternative method or measure proposed will be consistent with the Act. 3. Any variance must be specifically approved by the Division in writing.
R647-3-111. Surety. 1. After receiving notification that the notice of intention is complete, but prior to commencement of operations, the operator must post a reclamation surety with the Division. 1.11. Failure to furnish and maintain reclamation surety may, after notice and opportunity for Board hearing, result in a withdrawal of the notice of intention as provided for in Section 40-8-16. 2. The Division will not require a separate surety where a reclamation surety in a form and amount acceptable to the Division is held by other governmental entities, provided that the cost estimate is accurate and the Division is named as co-beneficiary. Cooperative Agreements may be developed and entered into according to Section 40-8-22. 3. As part of the review of the notice of intention, the Division shall determine the required surety amount based on: 3.11. Site-specific calculations or estimates by the Division reflecting the cost the Division or a third party would incur to reclaim the site; 3.12. Site-specific calculations or estimates by the operator reflecting the cost the Division or a third party would incur to reclaim the site, if accurate and verifiable by the Division; or 3.13. The average dollars per acre costs for reclamation of similar operations, as determined by the Division, based upon approved surety amounts for current large mining operations. 3.14. In determining or verifying the amount of surety under Section 3.11 or 3.12, the Division shall use cost data from current sureties for large mining operations, adjusted as necessary to reflect the nature and scope of operations and reclamation under the notice of intention. 4. The operator shall submit a completed Reclamation Contract (FORM MR-RC) with the required surety. The form and amount of the surety must be approved by the Division, except as provided in subpart 4.16. Acceptable forms may include: 4.11. A corporate surety bond from a surety company that is licensed to do business in Utah, that is listed in "A.M. Best's Key Rating Guide" at a rating of A- or better or a Financial Performance Rating (FPR) of 8 or better, according to the "A.M. Best's Guide". All surety companies also will be continuously listed in the current issue of the U.S. Department of the Treasury Circular 570. Operators who do not have a surety bond with a company that meets the standards of subsection 4.11 will have 120 days from the date of Division notification after enactment of the changes to subsection 4.11 to achieve compliance or face enforcement action. When the Division in the course of examining surety bonds, notifies an operator that a surety company guaranteeing its performance does not meet the standards of subsection 4.11, the operator has 120 days after notice from the Division by mail to correct the deficiency, or face enforcement action; 4.12. Federally-insured certificate of deposit payable to the State of Utah, Division of Oil, Gas and Mining; 4.13. Cash; 4.14. An irrevocable letter of credit issued by a bank organized to do business in the United States; 4.15. Escrow accounts; and 4.16. The Board may approve a written self-bonding agreement in the case of operators showing sufficient financial strength. 5. Surety shall be required until such time as the Division deems reclamation complete. The Division will promptly conduct an inspection when notified by the operator that reclamation is complete. The full release of surety shall be evidence that the operator has reclaimed as required by the Act. 5.11. A partial release of surety can be made by the Division if it determines that a substantial phase or segment of reclamation such as demolition, backfilling, regrading, or vegetation establishment has been successfully performed and the residual amount of retained surety is determined adequate to insure completion. 6. The amount of reclamation surety may be adjusted: 6.11. As required by a revision in the Notice of Intention under R647-3-115; 6.12. As a result of a periodic review by the Division conducted no more frequently than at 3 year intervals unless agreed to by the operator, which shall take into account inflation/deflation based upon an acceptable Costs Index; or 6.13. At the request of the operator. 7. Notwithstanding any other provision of these rules, for operations where the surety is in the form of a Board-approved agreement under Section 40-8-14(3), the Board shall retain the sole authority over the release, partial release, revision or adjustment of the surety amount, if any, which shall be in accordance with the agreement and the Act.
R647-3-[ If the operator of a small mining operation fails or
refuses to conduct reclamation as required by the complete notice of
intention, and fails or refuses to comply with R647-3-107, R647-3-108, or
R647-3-109,[ 1. Reclamation be conducted by the Division; and 2. The costs and
expenses of reclamation, together with costs of collection including attorney's
fees, be recovered in a civil action brought by the attorney general against
the operator in any appropriate court[ 3. Any surety filed for this purpose be forfeited. With respect to the surety filed with the Division, the Board shall request the Attorney General to take the necessary legal action to enforce and collect the amount of liability. Where reclamation surety has been filed with another governmental agency, the Board shall notify such agency of the hearing findings, and seek forfeiture concurrence as necessary. 3.11. The forfeited surety shall be used only for the reclamation of the land to which is relates, and any residual amount returned.
R647-3-[ 1. All mine operations are required to be maintained in a safe, clean, and environmentally stable condition. Active and inactive operations must continue to submit annual reports unless waived in writing by the Division. 2. The operator need not notify the Division of the temporary suspension of small mining operations. 3. In the case of a termination or a suspension of mining operations that has exceeded, or is expected to exceed two (2) years, the operator shall, upon request, furnish the Division with such data as it may require to evaluate the status of the small mining operation, the status of compliance with these rules, and the probable future status of the land affected. Upon review of such data, the Division will take such action as may be appropriate. The Division may grant an extended suspension period if warranted. 4. The operator shall give the Division prompt written notice of a termination or suspension of small mining operations expected to exceed five (5) years. Upon receipt of notification the Division shall, within 30 days, make an inspection of the property. 5. Small mining operations that have been approved for an extended suspension period will be reevaluated on a regular basis. Additional interim reclamation or stabilization measures may be required in order for a small mining operation to remain in a continued state of suspension. Reclamation of a small mining operation may be required after five (5) years of continued suspension. The Division will require complete reclamation of the mine site when the suspension period exceeds 10 years, unless the operator appeals to the Board prior to the expiration of the 10-year period and shows good cause for a longer suspension period.
R647-3-[ Before enlarging a small mining operation beyond five (5) acres of surface disturbance, the operator must file a Notice of Intention to Commence Large Mining Operations (FORM MR-LMO) and receive Division approval.
R647-3-[ 1. Small mining operators are required to submit a revision to the complete notice of intention when a significant change(s) in the small mining operation occurs. A revision can be made by submitting a revised FORM MR-SMO (or similar form) and indicating the portion(s) of the operation which is being revised. 2. Division approval of a revision of small mining operations is not required but the operational change may not be implemented until the Division determines that the revised NOI is complete. 3.
In the event the Division or the operator determine at the time a
revision is submitted that the amount of the current surety does not accurately
reflect the potential cost to complete reclamation at any point in time during
the revised small mining operations, the Division may undertake a recalculation
of the surety amount as provided in R647-3-111.3. If the recalculated amount is greater than the amount of the
existing surety, the revised operations may not be implemented until a revised
surety is approved by the Division[
R647-3-[ If an operator wishes to transfer a small mining
operation to another party, an application form entitled, Transfer of Notice of
Intention - Small Mining Operations (FORM MR-TRS) must be completed and filed
with the Division. The new mine
operator must post adequate reclamation surety and assume full
responsibility for all disturbances of the permitted operation. The form and amount of surety must be
approved by the Division for the transfer to be complete[
R647-3-[ 1. On or before January 31 of each year, unless waived in writing by the Division, each operator conducting small mining operations must file an operations and progress report (FORM MR-AR) describing its operations during the preceding calendar year, including: 1.11. The location of the operation and the number and date of the applicable Notice of Intention; 1.12. The gross amounts of ore and waste materials moved during the year, as well as the disposition of such materials; 1.13. New surface disturbances created during the year; 1.14. The reclamation work performed during the year. 2. The operator shall keep and maintain timely records relating to his performance under the Act and still make these records available to the Division upon request.
R647-3-[ The Administrative Procedures, as outlined in the R647-5 Rules, shall be applicable to minerals regulatory proceedings.
R647-3-[ Information provided in the notice of intention relating to the location, size, and nature of the mineral deposit, and marked confidential by the operator, shall be protected as confidential information by the Board and the Division. The information will not be a matter of public record until a written release is received from the operator, or until the notice of intention is terminated.
KEY: minerals reclamation [ Notice of Continuation July 8, 2003 40-8-1 et seq.
|
|
ADDITIONAL INFORMATION |
|
|
PLEASE NOTE:
|
|
|
For questions regarding the content or application of this rule, please contact Ron Daniels at the above address, by phone at 801-538-5316, by FAX at 801-359-3940, or by Internet E-mail at rondaniels@utah.gov For questions about the rulemaking process, please contact the Division of Administrative Rules (801-538-3764). Please Note: The Division of Administrative Rules is NOT able to answer questions about the content or application of these administrative rules. |
|