8.1 PURPOSE, SCOPE, APPLICABILITY
(a) The purpose of R315-7 is to establish minimum State of Utah standards that define the acceptable management of hazardous waste during the period of interim status and until certification of final closure or, if the facility is subject to post-closure requirements, until post-closure responsibilities are fulfilled.
(b) Except as provided in R315-7-30, which incorporates by reference 40 CFR 265.1080(b), the standards of R315-7 and of R315-8-21, which incorporates by reference 40 CFR 264.552 through 264.554, apply to owners and operators of facilities that treat, store, or dispose of hazardous waste who have fully complied with the requirements of interim status under State or Federal requirements and R315-3-2.1 until either a permit is issued under R315-3 or until applicable R315-7 closure and post-closure responsibilities are fulfilled, and to those owners and operators of facilities in existence on November 19, 1980, who have failed to provide timely notification as required by Section 3010(a) of RCRA or failed to file part A of the permit application as required by R315-3-2.1(d) and (f). These standards apply to all treatment, storage, and disposal of hazardous waste at these facilities after the effective date of these rules, except as specifically provided otherwise in R315-7 or R315-2.
(c) The requirements of R315-7 do not apply to the following:
(1) The owner or operator of a POTW with respect to the treatment or storage of hazardous wastes which are delivered to the POTW;
(2) The owner or operator of a facility approved by the State of Utah to manage municipal or industrial solid waste, if the only hazardous waste the facility treats, stores, or disposes of is excluded from regulation under R315-7 by R315-2-5;
(3) The owner or operator of a facility managing recyclable materials described in 40 CFR 261.6(a)(2), (3), and (4), which is incorporated by reference in R315-2-6, except to the extent that they are referred to in R315-15 or R315-14-2, which incorporates by reference 40 CFR subpart D, R315-14-5, which incorporates by reference 40 CFR 266 subpart F, and R315-14-6, which incorporates by reference 40 CFR 266 subpart G;
(4) A generator accumulating hazardous waste on-site in compliance with R315-5-3.34, which incorporates by reference 40 CFR 262.34, except to the extent the requirements are included in R315-5-3.34, which incorporates by reference 40 CFR 262.34;
(5) A farmer disposing of waste pesticides from his own use in compliance with R315-5-7;
(6) The owner or operator of a totally enclosed treatment facility, as defined in R315-1;
(7) The owner or operator of an elementary neutralization unit or a wastewater treatment unit as defined in R315-1-1(b), which incorporates by reference 40 CFR 260.10, provided that if the owner or operator is diluting hazardous ignitable (D001) wastes, other than the D001 High TOC Subcategory defined in the Table of Treatment Standards for Hazardous Wastes in 40 CFR 268.40 as incorporated by reference at R315-13, or reactive (D003) waste, to remove the characteristic before land disposal, the owner/operator must comply with the requirements set out in R315-7-9.8(b);
(8) A transporter storing manifested shipments of hazardous waste in containers meeting the requirements of R315-5-3.30 at a transfer facility for a period of ten days or less;
(9)(i) Except as provided in R315-7-8(c)(9)(i), a person engaged in treatment or containment activities during immediate response to any of the following situations:
(A) A discharge of a hazardous waste;
(B) An imminent and substantial threat of a discharge of a hazardous waste;
(C) A discharge of a material which, when discharged, becomes a hazardous waste.
(ii) An owner or operator of a facility otherwise regulated by this section shall comply with all applicable requirements of R315-7-10 and R315-7-11.
(iii) Any person who is covered by R315-7-8(c)(9)(i) and who continues or initiates hazardous waste treatment or containment activities after the immediate response is over is subject to all applicable requirements of R315-7 and of R315-3 for those activities.
(iv) In the case of an explosives or munitions emergency response, if a State or local official acting within the scope of his or her official responsibilities, or an explosives or munitions emergency response specialist, determines that immediate removal of the material or waste is necessary to protect human health or the environment, that official or specialist may authorize the removal of the material or waste by transporters who do not have EPA identification numbers and without the preparation of a manifest. In the case of emergencies involving military munitions, the responding military emergency response specialist's organizational unit shall retain records for three years identifying the dates of the response, the responsible persons responding, the type and description of material addressed, and its disposition.
(10) The addition of absorbent material to waste in a container, as defined in R315-1, or the addition of waste to the absorbent material in a container provided that these actions occur at the time waste is first placed in the containers; and R315-7-9.8(b), R315-7-16.2 and R315-7-16.3 are complied with;
(11) Universal waste handlers and universal waste transporters (as defined in R315-16-1.9) handling the wastes listed below. These handlers are subject to regulation under section R315-16, when handling the below listed universal wastes:
(i) Batteries as described in R315-16-1.2;
(ii) Pesticides as described in R315-16-1.3;
(iii) Mercury thermostats as described in R315-16-1.4; and
(iv) Mercury lamps as described in R315-16-1.5.
(d) Notwithstanding any other provisions of these rules enforcement actions may be brought pursuant to R315-2-14 or Section 19-6-115 Utah Solid and Hazardous Waste Act.
(e) The following hazardous wastes shall not be managed at facilities subject to regulation under R315-7.
(1) EPA Hazardous Waste Nos. F020, F021, F022, F023, F026, or F027 unless:
(i) The wastewater treatment sludge is generated in a surface impoundment as part of the plant's wastewater treatment system;
(ii) The waste is stored in tanks or containers;
(iii) The waste is stored or treated in waste piles that meet the requirements of R315-8-12.1(c) as well as all other applicable requirements of R315-8-12;
(iv) The waste is burned in incinerators that are certified pursuant to the standard and procedures in R315-7-22.6; or
(v) The waste is burned in facilities that thermally treat the waste in a device other than an incinerator and that are certified pursuant to the standards and procedures in R315-7-23.7.
(f) The requirements of this rule apply to owners or operators of all facilities which treat, store, or dispose of hazardous waste referred to in R315-13, which incorporates by reference 40 CFR 268, and the R315-13 standards are considered material conditions or requirements of the R315-7 interim status standards.
9.1 APPLICABILITY
The rules in this section apply to the owners and operators of all hazardous waste management facilities, except as provided otherwise in R315-7-8.1.
9.2 IDENTIFICATION NUMBER
Every facility owner or operator shall apply for an EPA identification number in accordance with Section 3010 of RCRA. Facility owners or operators who did not obtain an EPA Identification Number for their facilities through the notification process shall obtain one. Information on obtaining this number can be acquired by contacting the Utah Division of Solid and Hazardous Waste Management.
9.3 REQUIRED NOTICES
(a)(1) An owner or operator of a facility that has arranged to receive hazardous waste from a foreign source shall notify the Board in writing at least four weeks in advance of the expected date of arrival of these shipments at the facility. A notice of subsequent shipments of the same waste from the same foreign sources is not required.
(2) The owner or operator of a recovery facility that has arranged to receive hazardous waste subject to R315-5-15, which incorporates by reference 40 CFR 262, subpart H, shall provide a copy of the tracking document bearing all required signatures to the notifier, to the Division of Solid and Hazardous Waste, P.O. Box 144880, Salt Lake City, Utah, 84114-4880; Office of Enforcement and Compliance Assurance, Office of Compliance, Enforcement Planning, Targeting and Data Division (2222A), Environmental Protection Agency, 401 M St., SW., Washington, DC 20460; and to the competent authorities of all other concerned countries within three working days of receipt of the shipment. The original of the signed tracking document must be maintained at the facility for at least three years.
(b) Before transferring ownership or operation of a facility during its operating life, or of a disposal facility during the post-closure care period, the owner or operator shall notify the new owner or operator in writing of the requirements of R315-7 and R315-3. An owner's or operator's failure to notify the new owner or operator of the requirements of R315-7 in no way relieves the new owner or operator of his obligation to comply with all applicable requirements.
9.4 GENERAL WASTE ANALYSIS
The requirements of 40 CFR 265.13, 1996 ed., are adopted and incorporated by reference.
9.5 SECURITY
(a) A facility owner or operator shall prevent the unknowing entry, and minimize the possibility for the unauthorized entry, of persons or livestock onto the active portion of his facility; unless
(1) Physical contact with the waste, structures, or equipment within the active portion of the facility will not injure unknowing or unauthorized persons or livestock which may enter the active portion of a facility; and
(2) Disturbance of the waste or equipment by the unknowing or unauthorized entry of persons or livestock onto the active portion of a facility will not cause a violation of the requirements of R315-7.
(b) Unless exempt under R315-7-9.5(a)(1) and (a)(2), facilities shall have;
(1) A 24-hour surveillance system, e.g., television monitoring or surveillance by guards or facility personnel, which continuously monitors and controls entry onto the active portion of the facility; or
(2)(i) An artificial or natural barrier or both, e.g. a fence in good repair or a cliff, which completely surrounds the active portion of the facility; and
(ii) A means to control entry at all times through the gates or other entrances to the active portion of the facility, e.g., an attendant, television monitors, locked entrance, or controlled roadway access to the facility.
The requirements of R315-7-9.5(b) are satisfied if the facility or plant within which the active portion is located itself has a surveillance system or a barrier and a means to control entry which complies with the requirements of R315-7-9.5(b)(1) and (2).
(c) Unless exempt under R315-7-9.5(a)(1) and (a)(2), a sign with the legend, "Danger -Unauthorized Personnel Keep Out", shall be posted at each entrance to the active portion of a facility and at other locations, in sufficient numbers to be seen from any approach to the active portion. The legend shall be written in English and any other language predominant in the area surrounding the facility and shall be legible from a distance of at least twenty-five feet. Existing signs with a legend other than "Danger - Unauthorized Personnel Keep Out" may be used if the legend on the sign indicates that only authorized personnel are allowed to enter the active portion, and that entry onto the active portion is potentially dangerous.
Owners or operators are encouraged to also describe on the sign the type of hazard, e.g., hazardous waste, flammable wastes, etc., contained within the active portion of the facility. See R315-7-14.7(b) for discussion of security requirements at disposal facilities during the post-closure care period.
9.6 GENERAL INSPECTION REQUIREMENTS
(a) Facility owners or operators shall inspect their facilities for malfunctions and deterioration, operator errors, and discharges, which may be causing or may lead to (1) release of hazardous waste constituents to the environment or (2) a threat to human health. These inspections shall be conducted frequently enough to identify problems in time to correct them before they harm human health or the environment.
(b)(1) Facility owners or operators shall develop and follow a written schedule for inspecting monitoring equipment, safety and emergency equipment, security devices, and operating and structural equipment, e.g., dikes and sump pumps, that are important to preventing, detecting, or responding to environmental or human health hazards.
(2) The schedule shall be kept at the facility.
(3) The schedule shall identify the types of problems, e.g., malfunctions or deterioration, which are to be looked for during the inspection, e.g., inoperative sump pump, leaking fitting, eroding dike, etc.
(4) The frequency of inspection may vary for the items on the schedule. However, the frequency should be based on the rate of deterioration of the equipment and the probability of an environmental or human health incident if the deterioration, malfunction, or any operator error goes undetected between inspections. Areas subject to spills, such as loading and unloading areas shall be inspected daily when in use. At a minimum, the inspection schedule shall include the items and frequencies called for in R315-7-16.5, R315-7-17, which incorporates by reference 40 CFR 265.190 - 265.201, R315-7-18.5, R315-7-19.12, R315-7-20.5, R315-7-21.12, R315-7-22.4, R315-7-23.4, R315-7-24.4, R315-7-26, which incorporates by reference 40 CFR 265.1033, R315-7-27, which incorporates by reference 40 CFR 265.1052, 265.1053, and 265.1058 and R315-7- 30, which incorporates by reference 40 CFR 265.1084 through 265.1090.
(c) The owner or operator shall remedy any deterioration or malfunction of equipment or structures which the inspection reveals on a schedule which ensures that the problem does not lead to an environmental or human health hazard. Where a hazard is imminent or has already occurred, remedial action shall be taken immediately.
(d) The owner or operator shall keep records of inspections in an inspection log or summary. These records shall be retained for at least three years. At a minimum, these records shall include the date and time of the inspection, the name of the inspector, a notation of the observations made, and the date and nature of any repairs made or remedial actions taken.
9.7 PERSONNEL TRAINING
(a)(1) Facility personnel shall successfully complete a program of classroom instruction or on-the- job training that teaches them to perform their duties in a way that ensures the facility's compliance with the requirements of R315-7, and that includes all the elements described in R315-7-9.7(d)(3).
(2) This program shall be directed by a person trained in hazardous waste management procedures, and shall include instruction supplementing the facility personnel's existing job knowledge, which teaches facility personnel hazardous waste management procedures, including contingency plan implementation, relevant to the positions in which they are employed.
(3) At a minimum, the training program shall be designed to ensure that facility personnel are able to respond effectively to emergencies by familiarizing them with emergency procedures, emergency equipment, and emergency systems, including, but not necessarily limited to, the following, where applicable:
(i) Procedures for using, inspecting, repairing, and replacing facility emergency and monitoring equipment;
(ii) Key parameters for automatic waste feed cut-off systems;
(iii) Communications or alarm systems or both;
(iv) Response to fires or explosions;
(v) Response to groundwater contamination incidents; and
(vi) Shutdown of operations.
(b) Facility personnel shall successfully complete the program required in R315-7-9.7(a) within six months after the effective date of these rules or six months after the date of employment or assignment to a facility, or to a new position at a facility, whichever is later. Employees hired after the effective date of these rules shall not work in unsupervised positions until they have completed the training requirements of R315-7-9.7(a).
(c) Facility personnel shall take part in an annual review of their initial training in R315-7- 9.7(a).
(d) Owners or operators of facilities shall maintain the following documents and records at their facilities and make them available to the Board or its duly appointed representative upon request:
(1) The job title for each position at the facility related to hazardous waste management, and the name of the employee filling each job;
(2) A written job description for each position listed under R315-7-9.7(d)(1). This description may be consistent in its degree of specificity with descriptions for other similar positions in the same company location or bargaining unit, but shall include the requisite skill, education, or other qualifications and duties of facility personnel assigned to each position;
(3) A written description of the type and amount of both introductory and continuing training that will be given to each person filling a position listed under R315-7-9.7(d)(1); and
(4) Records that document that the training or job experience required under paragraphs R315-7- 9.7(a), (b), and (c) has been given to, and completed by, facility personnel.
(e) Training records on current personnel shall be maintained until closure of the facility; training records on former employees shall be maintained for at least three years from the date the employee last worked at the facility. Personnel training records may accompany personnel transferred within the same company.
9.8 GENERAL REQUIREMENTS FOR IGNITABLE, REACTIVE, OR INCOMPATIBLE WASTES
(a) The owner or operator shall take precautions to prevent accidental ignition or reaction of ignitable or reactive waste. This waste shall be separated and protected from sources of ignition or reaction including but not limited to: open flames, smoking, cutting and welding, hot surfaces, frictional heat, sparks, static, electrical, or mechanical, spontaneous ignition, e.g., from heat-producing chemical reactions, and radiant heat. While ignitable or reactive waste is being handled, the owner or operator shall confine smoking and open flames to specially designated locations. "No Smoking" signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive waste.
(b) Where specifically required by R315-7, the treatment, storage, or disposal of ignitable or reactive waste and the mixture or commingling of incompatible wastes, or incompatible wastes and materials, shall be conducted so that it does not:
(1) Generate uncontrolled extreme heat or pressure, fire or explosion, or violent reaction;
(2) Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health;
(3) Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosion;
(4) Damage the structural integrity of the device or facility containing the waste; or
(5) Through other like means threaten human health or the environment.
9.9 LOCATION STANDARDS
The placement of any hazardous waste in a salt dome, salt bed formation, underground mine or cave is prohibited, except for the Department of Energy Waste Isolation Pilot Project in New Mexico.
9.10 CONSTRUCTION QUALITY ASSURANCE PROGRAM
(a) CQA program. (1) A construction quality assurance, CQA, program is required for all surface impoundment, waste pile, and landfill units that are required to comply with R315-7-18.9(a), R315-7-19.9, and R315-7- 21.10(a). The program shall ensure that the constructed unit meets or exceeds all design criteria and specifications in the permit. The program shall be developed and implemented under the direction of a CQA officer who is a registered professional engineer.
(2) The CQA program shall address the following physical components, where applicable:
(i) Foundations;
(ii) Dikes;
(iii) Low-permeability soil liners;
(iv) Geomembranes, flexible membrane liners;
(v) Leachate collection and removal systems and leak detection systems; and
(vi) Final cover systems.
(b) Written CQA plan. Before construction begins on a unit subject to the CQA program under R315-7- 9.10(a), the owner or operator shall develop a written CQA plan. The plan shall identify steps that will be used to monitor and document the quality of materials and the condition and manner of their installation. The CQA plan shall include:
(1) Identification of applicable units, and a description of how they will be constructed.
(2) Identification of key personnel in the development and implementation of the CQA plan, and CQA officer qualifications.
(3) A description of inspection and sampling activities for all unit components identified in R315-7- 9.10(a)(2), including observations and tests that will be used before, during, and after construction to ensure that the construction materials and the installed unit components meet the design specifications. The description shall cover: Sampling size and locations; frequency of testing; data evaluation procedures; acceptance and rejection criteria for construction materials; plans for implementing corrective measures; and data or other information to be recorded and retained in the operating record under R315-7-12.4.
(c) Contents of program. (1) The CQA program shall include observations, inspections, tests, and measurements sufficient to ensure:
(i) Structural stability and integrity of all components of the unit identified in R315-7- 9.10(a)(2);
(ii) Proper construction of all components of the liners, leachate collection and removal system, leak detection system, and final cover system, according to permit specifications and good engineering practices, and proper installation of all components, e.g., pipes, according to design specifications;
(iii) Conformity of all materials used with design and other material specifications under R315-8- 11.2, R315-8-12.2, and R315-8-14.2.
(2) The CQA program shall include test fills for compacted soil liners, using the same compaction methods as in the full-scale unit, to ensure that the liners are constructed to meet the hydraulic conductivity requirements of R315-8-11.2(c)(1), R315-8-12.2(c)(1), and R315-8-14.2(c)(1) in the field. Compliance with the hydraulic conductivity requirements shall be verified by using in-situ testing on the constructed test fill. The test fill requirement is waived where data are sufficient to show that a constructed soil liner meets the hydraulic conductivity requirements of R315-8- 11.2(c)(1), R315-8-12.2(c)(1), and R315-8-14.2(c)(1) in the field.
(d) Certification. The owner or operator of units subject to R315-7-9.10 shall submit to the Executive Secretary by certified mail or hand delivery, at least 30 days prior to receiving waste, a certification signed by the CQA officer that the CQA plan has been successfully carried out and that the unit meets the requirements of R315-8- 11.2(a), R315-8-12.2, or R315-8-14.2(a). The owner or operator may receive waste in the unit after 30 days from the Executive Secretary's receipt of the CQA certification unless the Executive Secretary determines in writing that the construction is not acceptable, or extends the review period for a maximum of 30 more days, or seeks additional information from the owner or operator during this period. Documentation supporting the CQA officer's certification shall be furnished to the Executive Secretary upon request.
10.1 APPLICABILITY
The rules in this section apply to the owners and operators of all hazardous waste management facilities, except as provided otherwise in R315-7-8.1.
10.2 MAINTENANCE AND OPERATION OF FACILITY
Facilities shall be maintained and operated to minimize the possibility of a fire, explosion or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which could threaten human health or the environment.
10.3 REQUIRED EQUIPMENT
All facilities shall be equipped with the following, unless there are no hazards posed by waste handled at the facility which could require a particular kind of equipment specified below:
(a) An internal communications or alarm system capable of providing immediate emergency instruction, voice or signal, to facility employees;
(b) A device capable of summoning external emergency assistance from law enforcement agencies, fire departments or state or local emergency response teams, such as a telephone, immediately available at the scene of operations, or a hand-held two way radio;
(c) Portable fire extinguishers, fire control equipment, including special extinguishing equipment, such as that using foam, inert gas, or dry chemicals, discharge control equipment, and decontamination equipment; and
(d) Water at adequate volume and pressure to supply water hose streams, or foam producing equipment, or automatic sprinklers, or water spray systems.
10.4 TESTING AND MAINTENANCE OF EQUIPMENT
All facility communications or alarm systems, fire protection equipment, safety equipment, discharge control equipment, and decontamination equipment, where required, shall be tested and maintained as necessary to assure its proper operation in time of emergency.
10.5 ACCESS TO COMMUNICATIONS OR ALARM SYSTEM
(a) Whenever hazardous waste is being poured, mixed, spread, or otherwise handled, all employees involved in the operation shall have immediate access to an internal alarm or emergency communication device, either directly or through visual or voice contact with another employee, unless a device is not required under R315-7-10.3.
(b) If there is just one employee on the premises while the facility is operating, he shall have immediate access to a device capable of summoning external emergency assistance, such as a telephone, immediately available at the scene of operation, or a hand-held two-way radio, unless a device is not required under R315-7-10.3.
10.6 REQUIRED AISLE SPACE
The facility owner or operator shall maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, discharge control equipment, and decontamination equipment to any area of facility operation in an emergency, unless aisle space is not needed for any of these purposes.
10.7 ARRANGEMENTS WITH LOCAL AUTHORITIES
(a) The owner or operator shall attempt to make the following arrangements, as appropriate for the type of waste handled at his facility and the potential need for the services of these organizations:
(1) Arrangements to familiarize law enforcement agencies, fire departments, and emergency response teams with the layout of the facility, properties of hazardous waste handled at the facility and associated hazards, places where facility personnel would normally be working, entrances to the roads inside the facility, and possible evacuation routes;
(2) Where more than one law enforcement agency and fire department might respond to an emergency, agreements designating primary emergency authority to a specific law enforcement agency and a specific fire department, and agreements with any others to provide support to the primary emergency authority;
(3) Agreements with state emergency response teams, emergency response contractors, and equipment suppliers; and
(4) Arrangements to familiarize local hospitals with the properties of hazardous waste handled at the facility and the types of injuries or illnesses which could result from fires, explosions, or releases at the facility.
(b) Where state or local authorities decline to enter into these arrangements, the owner or operator shall document the refusal in the operating record.
11.1 APPLICABILITY
The rules in this section apply to the owners and operators of all hazardous waste management facilities, except as provided otherwise in R315-7-8.1.
11.2 PURPOSE AND IMPLEMENTATION OF CONTINGENCY PLAN
(a) Each owner or operator shall have a contingency plan for his facility designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden discharge of hazardous waste or hazardous waste constituents to air, soil, or surface water.
(b) The provisions of the plan shall be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten the environment or human health.
11.3 CONTENT OF CONTINGENCY PLAN
(a) The contingency plan shall describe the actions facility personnel shall take to comply with R315-7-11.2 and R315-7-11.7 in response to fires, explosions, or any unplanned sudden or non-sudden discharge of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility.
(b) If a facility owner or operator already has prepared a Spill Prevention, Control and Countermeasures (SPCC) Plan in accordance with 40 CFR 112, or some other emergency or contingency plan, he need only amend that plan to incorporate hazardous waste management provisions sufficient to comply with the requirements of R315-7.
(c) The plan shall describe arrangements agreed to by local law enforcement agencies, fire departments, hospitals, contractors, and state and local emergency response teams to coordinate emergency services, in accordance with R315-7-10.7.
(d) The plan shall list names, addresses, phone numbers, office and home, of all persons qualified to act as facility emergency coordinator, see R315-7-11.6, and this list shall be kept up-to-date. Where more than one person is listed, one shall be named as primary emergency coordinator and others shall be listed in the order in which they will assume responsibility as alternates.
(e) The plan shall include a list of all emergency equipment at the facility, such as fire extinguishing systems, discharge control equipment, communications and alarm systems, internal and external, and decontamination equipment, where this equipment is required. This list shall be kept up-to-date. In addition, the plan shall include the location and physical description of each item on the list, and a brief outline of its capabilities.
(f) The plan shall include an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan shall describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes, in cases where the primary routes could be blocked by discharges of hazardous waste or fires.
11.4 COPIES OF CONTINGENCY PLAN
A copy of the contingency plan and all revisions to the plan shall be:
(a) Maintained at the facility;
(b) Made available to the Board or its duly appointed representative upon request; and
(c) Submitted to all local law enforcement agencies, fire departments, hospitals, and state and local emergency response teams that may be called upon to provide emergency services.
11.5 AMENDMENT OF CONTINGENCY PLAN
The contingency plan shall be reviewed, and immediately amended, if necessary, under any of the following circumstances:
(a) Revisions to applicable regulations;
(b) Failure of the plan in an emergency;
(c) Changes in the facility design, construction, operation, maintenance, or other circumstances that materially increase the potential for discharges of hazardous waste or hazardous waste constituents, or change the response necessary in an emergency;
(d) Changes in the list of emergency coordinators; or
(e) Changes in the list of emergency equipment.
11.6 EMERGENCY COORDINATOR
At all times, there shall be at least one employee either on the facility premises or on call, i.e., available to respond to an emergency by reaching the facility within a short period of time, with the responsibility for coordinating all emergency response measures. This facility emergency coordinator shall be thoroughly familiar with all aspects of the facility's contingency plan, all operations and activities at the facility, the location of all records within the facility, and the facility layout. In addition, this person shall have the authority to commit the resources needed to carry out the contingency plan. The emergency coordinator's responsibilities are more fully spelled out in R315- 7-11.7. Applicable responsibilities for the emergency coordinator vary depending on factors such as type and variety of waste(s) handled by the facility, and type and complexity of the facility.
11.7 EMERGENCY PROCEDURES
(a) Whenever there is an imminent or actual emergency situation, the emergency coordinator, or his designee when the emergency coordinator is on call, shall immediately:
(1) Activate internal facility alarms or communication systems, where applicable, to notify all facility personnel; and
(2) Notify appropriate state or local agencies with designated response roles whenever their assistance is needed.
(b) In the event of a discharge, fire, or explosion, the facility's emergency coordinator shall immediately identify the character, exact source, amount, and areal extent of any discharged materials. He may do this by observation or review of facility records or manifests, and, if necessary, by chemical analysis.
(c) Concurrently, the facility's emergency coordinator shall immediately assess possible hazards to the environment or human health that may result from the discharge, fire, or explosion. This assessment shall consider both direct and indirect effects of the discharge, fire, or explosion, e.g., the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat-induced explosions.
(d) If the emergency coordinator determines that the facility has had a discharge, fire, or explosion which could threaten human health or the environment, outside the facility, he shall report his findings as follows:
(1) If his assessment indicates that evacuation of local areas may be advisable, he shall immediately notify appropriate local authorities. He shall be available to assist appropriate officials in making the decision whether local areas should be evacuated; and
(2) He shall immediately notify both the Utah State Department of Environmental Quality as specified in R315-9 and the government officials designated as the on-scene coordinator for that geographical area, in the applicable regional contingency plan under 40 CFR 1510, or the National Response Center, 800/424-8802. The report shall include:
(i) Name and telephone number of reporter;
(ii) Name and address of facility;
(iii) Time and type of incident, e.g., discharge, fire;
(iv) Name and quantity of material(s) involved, to the extent available;
(v) The extent of injuries, if any; and
(vi) The possible hazards to human health, or the environment, outside the facility.
(e) During an emergency, the facility's emergency coordinator shall take all reasonable measures necessary to ensure that fires, explosions, and discharges do not occur, recur, or spread to other hazardous waste at the facility. These measures shall include, where applicable, stopping processes and operations, collecting and containing discharged waste, and removing or isolating containers.
(f) If the facility stops operations in response to a discharge, fire, or explosion, the facility's emergency coordinator shall monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate.
(g) Immediately after an emergency, the facility's emergency coordinator shall provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material that results from a discharge, fire, or explosion at the facility.
Unless the owner or operator can demonstrate, in accordance with R315-2-3(c) or (d), that the recovered material is not a hazardous waste, the owner or operator becomes a generator of hazardous waste and shall manage it in accordance with all applicable requirements in R315-4, R315-5, R315-7, and R315-8.
(h) The facility's emergency coordinator shall ensure that, in the affected area(s) of the facility:
(1) No waste that may be incompatible with the discharged material is treated, stored, or disposed of until cleanup procedures are completed; and
(2) All emergency equipment listed in the contingency plan is cleaned and fit for its intended use before operations are resumed.
(i) The facility owner or operator shall notify the Board and other appropriate state and local authorities, that the facility is in compliance with R315-7-11.7(h) before operations are resumed in the affected area(s) of the facility.
(j) The facility owner or operator shall record in the operating record the time, date, and details of any incident that requires implementing the contingency plan. Within 15 days after the incident, he shall submit a written report on the incident to the Board. The report shall include:
(1) Name, address, and telephone number of the owner or operator;
(2) Name, address, and telephone number of the facility;
(3) Date, time, and type of incident, e.g., fire, discharge;
(4) Name and quantity of material(s) involved;
(5) The extent of injuries, if any;
(6) An assessment of actual or potential hazards to the environment or human health, where this is applicable; and
(7) Estimated quantity and disposition of recovered material that resulted from the incident.
12.1 APPLICABILITY
(a) The rules in R315-7-12 apply to owners and operators of both on-site and off-site facilities, except as provided otherwise in R315-7-8.1. R315-7-12.2, R315-7-12.3, and R315-7-12.7 do not apply to owners and operators of on-site facilities that do not receive any hazardous waste from off-site sources, nor to owners and operators of off-site facilities with respect to waste military munitions exempted from manifest requirements under 40 CFR 266.203(a).
(b) The revised Manifest form and procedures in R315-1-1, which incorporates by reference 40 CFR 260.10, R315-2-7, R315-7-12.1, R315-7-12.2, R315-7-12.3, and R315-7-12.7, contained in R315-1 to R315-8, edition revised as of September 15, 2004, shall be applicable until September 5, 2006.
12.2 USE OF MANIFEST SYSTEM
(a)(1) If a facility receives hazardous waste accompanied by a manifest, the owner, operator, or his agent, shall sign and date the manifest as indicated in R315-7-12.1(a)(2) to certify that the hazardous waste covered by the manifest was received, that the hazardous waste was received except as noted in the discrepancy space of the manifest, or that the hazardous waste was rejected as noted in the manifest discrepancy space.
(2) If a facility receives a hazardous waste shipment accompanied by a manifest, the owner, operator or his agent shall:
(i) Sign and date, by hand, each copy of the manifest;
(ii) Note any significant discrepancies in the manifest, as defined in R315-7-12.3, on each copy of the manifest;
(iii) Immediately give the transporter at least one copy of the manifest;
(iv) Within 30 days of delivery, send a copy of the manifest to the generator; and
(v) Retain at the facility a copy of each manifest for at least three years from the date of delivery.
(3) If a facility receives hazardous waste imported from a foreign source, the receiving facility shall mail a copy of the manifest to the following addresses within 30 days of delivery: International Compliance Assurance Division, OFA/OECA (2254A), U.S. Environmental Protection Agency, Ariel Rios Building, 1200 Pennsylvania Avenue, NW., Washington DC 20460 and Utah Division of Solid and Hazardous Waste, P O Box 144880, Salt Lake City, Utah 84114-4880.
(b) If a facility receives, from a rail or water (bulk shipment) transporter, hazardous waste which is accompanied by a shipping paper containing all the information required on the manifest (excluding the EPA identification numbers, generator's certification, and signatures) the owner or operator, or his agent, shall:
(1) Sign and date each copy of the manifest or shipping paper, if the manifest has not been received, to certify that the hazardous waste covered by the manifest or shipping paper was received;
(2) Note any significant discrepancies, as defined in R315-7-12.3(a), in the manifest or shipping paper, if the manifest has not been received, on each copy of the manifest or shipping paper;
(3) Immediately give the rail or water, bulk shipment, transporter at least one copy of the manifest or shipping paper, if the manifest has not been received;
(4) Within 30 days after the delivery, send a copy of the signed and dated manifest to the generator or a signed and dated copy of the shipping paper, to the generator; and
(5) Retain at the facility a copy of the manifest and shipping paper, if signed in lieu of the manifest at the time of delivery for at least three years from the date of delivery.
(c) Whenever a shipment of hazardous waste is initiated from a facility, the owner or operator of that facility shall comply with the requirements of R315-5.
The provisions of R315-5-9.1 are applicable to the on-site accumulation of hazardous wastes by generators and only apply to owners or operators who are shipping hazardous waste which they generated at that facility.
(d) Within three working days of the receipt of a shipment subject to R315-5-15, which incorporates by reference 40 CFR 262 subpart H, the owner or operator of the facility shall provide a copy of the tracking document bearing all required signatures to the notifier, to the Division of Solid and Hazardous Waste, P.O. Box 144880, Salt Lake City, Utah, 84114-4880; Office of Enforcement and Compliance Assurance, Office of Compliance, Enforcement Planning, Targeting and Data Division (2222A), Environmental Protection Agency, 401 M St., SW., Washington, DC 20460; and to competent authorities of all other concerned countries. The original copy of the tracking document shall be maintained at the facility for at least three years from the date of signature.
(e) A facility shall determine whether the consignment state for a shipment regulates any additional wastes (beyond those regulated Federally) as hazardous wastes under its state hazardous waste program. Facilities shall also determine whether the consignment state or generator state requires the facility to submit any copies of the manifest to these states.
12.3 MANIFEST DISCREPANCIES
(a) Manifest discrepancies are:
(1) Significant differences as defined by R315-7-12.3(b) between the quantity or type of hazardous waste designated on the manifest or shipping paper, and the quantity and type of hazardous waste a facility actually receives;
(2) Rejected wastes, which may be a full or partial shipment of hazardous waste that the treatment, storage, or disposal facility cannot accept; or
(3) Container residues, which are residues that exceed the quantity limits for "empty" containers set forth in R315-2-7(b).
(b) Significant discrepancies in quantity are: For bulk waste, variations greater than ten percent in weight; for batch waste, any variation in piece count, such as a discrepancy of one drum in a truckload. Significant differences in type are obvious differences which can be discovered by inspection or waste analysis, such as waste solvent substituted for waste acid, or toxic constituents not reported on the manifest or shipping paper.
(c) Upon discovering a significant difference in quantity or type, the owner or operator shall attempt to reconcile the discrepancy with the waste generator or transporter, e.g., with telephone conversations. If the discrepancy is not resolved within 15 days of receipt of the waste, the owner or operator shall immediately submit to the Executive Secretary a letter describing the discrepancy, and attempts to reconcile it, including a copy of the manifest or shipping paper at issue.
(d)(1) Upon rejecting waste or identifying a container residue that exceeds the quantity limits for "empty" containers set forth in R315-2-7(b), the facility shall consult with the generator prior to forwarding the waste to another facility that can manage the waste. If it is impossible to locate an alternative facility that can receive the waste, the facility may return the rejected waste or residue to the generator. The facility shall send the waste to the alternative facility or to the generator within 60 days of the rejection or the container residue identification.
(2) While the facility is making arrangements for forwarding rejected wastes or residues to another facility under R315-7-12.3, it must ensure that either the delivering transporter retains custody of the waste, pending delivery of the waste to the first transporter designated on the manifest prepared under R315-7-12.3(e) or (f).
(e) Except as provided in R315-7-12.3(e)(7), for full or partial load rejections and residues that are to be sent off-site to an alternate facility, the facility is required to prepare a new manifest in accordance with R315-5-2.20(a) and the following instructions:
(1) Write the generator's U.S. EPA ID number in Item 1 of the new manifest. Write the generator's name and mailing address in Item 5 of the new manifest. If the mailing address is different from the generator's site address, then write the generator's site address in the designated space for Item 5.
(2) Write the name of the alternate designated facility and the facility's U.S. EPA ID number in the designated facility block (Item 8) of the new manifest.
(3) Copy the manifest tracking number found in Item 4 of the old manifest to the Special Handling and Additional Information Block of the new manifest, and indicate that the shipment is a residue or rejected waste from the previous shipment.
(4) Copy the manifest tracking number found in Item 4 of the new manifest to the manifest reference number line in the Discrepancy Block of the old manifest (Item 18a) of R315.
(5) Write the DOT description for the rejected load or the residue in Item 9 (U.S. DOT Description) of the new manifest and write the container types, quantity, and volume(s) of waste.
(6) Sign the Generator's/Offeror's Certification to certify, as the offeror of the shipment, that the waste has been properly packaged, marked, and labeled and is in proper condition for transportation.
(7) For full load rejections that are made while the transporter remains present at the facility, the facility may forward the rejected shipment to the alternate facility by completing Item 18b of the original manifest and supplying the information on the next destination facility in the Alternate Facility space. The facility shall retain a copy of this manifest for its records, and then give the remaining copies of the manifest to the transporter to accompany the shipment. If the original manifest is not used, then the facility shall use a new manifest and comply with R315-7- 12.3(e)(1), (2), (3), (4), (5), and (6).
(f) Except as provided in R315-7-12.3(f)(7), for rejected wastes and residues that shall be sent back to the generator, the facility is required to prepare a new manifest in accordance with R315-5-2.20(a) and the following instructions:
(1) Write the facility's U.S. EPA ID number in Item 1 of the new manifest. Write the generator's name and mailing address in Item 5 of the new manifest. If the mailing address is different from the generator's site address, then write the generator's site address in the designated space for Item 5.
(2) Write the name of the initial generator and the generator's U.S. EPA ID number in the designated facility block (Item 8) of the new manifest.
(3) Copy the manifest tracking number found in Item 4 of the old manifest to the Special Handling and Additional Information Block of the new manifest, and indicate that the shipment is a residue or rejected waste from the previous shipment.
(4) Copy the manifest tracking number found in Item 4 of the new manifest to the manifest reference number line in the Discrepancy Block of the old manifest (Item 18a).
(5) Write the DOT description for the rejected load or the residue in Item 9 (U.S. DOT Description) of the new manifest and write the container types, quantity, and volume(s) of waste.
(6) Sign the Generator's/Offeror's Certification to certify, as offeror of the shipment, that the waste has been properly packaged, marked, and labeled and is in proper condition for transportation.
(7) For full load rejections that are made while the transporter remains at the facility, the facility may return the shipment to the generator with the original manifest by completing Item 18a and 18b of the manifest and supplying the generator's information in the Alternate Facility space. The facility shall retain a copy for its records and then give the remaining copies of the manifest to the transporter to accompany the shipment. If the original manifest is not used, then the facility shall use a new manifest and comply with R315-7-12.3(f)(1), (2), (3), (4), (5), and (6).
(g) If a facility rejects a waste or identifies a container residue that exceeds the quantity limits for "empty" containers set for in R315-2-7(b) after it has signed, date, and returned a copy of the manifest to the delivering transporter or to the generator, the facility shall amend its copy of the manifest to indicate the rejected wastes or residues in the discrepancy space of the amended manifest. The facility shall also copy the manifest tracking number from Item 4 of the new manifest to the Discrepancy space of the amended manifest, and shall re-sign and date the manifest to certify to the information as amended. The facility shall retain the amended manifest for at least three years from the date of amendment, and shall within30 days, send a copy of the amended manifest to the transporter and generator that received copies prior to their being amended.
12.4 OPERATING RECORD
The requirements as found in 40 CFR 265.73, 1997 ed., as amended by 62 FR 64636, December 8, 1997, are adopted and incorporated by reference.
12.5 AVAILABILITY, RETENTION, AND DISPOSITION OF RECORDS
(a) All records, including plans, required under R315-7 shall be furnished upon written request, and made available at all reasonable times for inspection.
(b) The retention period for all records required under R315-7 is extended automatically during the course of any unresolved enforcement action regarding the facility or as requested by the Board.
(c) A copy of records of waste disposal locations required to be maintained under R315-7-12.4, which incorporates by reference 40 CFR 265.73, shall be turned over to the Board and the local land authority upon closure of the facility, see R315-7-14, which incorporates by reference 40 CFR 265.110 - 265.120.
12.6 BIENNIAL REPORT
Owners or operators of facilities that treat, store, or dispose of hazardous waste shall prepare and submit a single copy of a biennial report to the Board by March 1 of each even numbered year. The biennial report shall be submitted on EPA form 8700-13B. The biennial report shall cover facility activities during the previous calendar year and shall include the following information:
(a) The EPA identification number, name, and address of the facility;
(b) The calendar year covered by the report;
(c) For off-site facilities, the EPA identification number of each hazardous waste generator from which a hazardous waste was received during the year; for imported shipments, the name and address of the foreign generator shall be given;
(d) A description and the quantity of each hazardous waste received by the facility during the year. For off-site facilities, this information shall be listed by EPA identification number of each generator;
(e) The method(s) of treatment, storage, or disposal for each hazardous waste;
(f) Monitoring data, where required under R315-7-13.5(a)(2)(ii) and (iii) and (b)(2) where required;
(g) The most recent closure cost estimate under R315-7-15, which incorporates by reference 40 CFR 265.140 - 265.150, and for disposal facilities, the most recent post-closure cost estimate under R315-7-15, which incorporates by reference 40 CFR 265.144;
(h) For generators who treat, store, or dispose of hazardous waste on-site, a description of the efforts undertaken during the year to reduce the volume and toxicity of waste generated;
(i) For generators who treat, store, or dispose of hazardous waste on-site, a description of the changes in volume and toxicity of waste actually achieved during the year in comparison to previous years to the extent the information is available for the years prior to 1984; and
(j) The certification signed by the owner or operator of the facility or his authorized representative.
12.7 UNMAINFESTED WASTE REPORT
(a) If a facility accepts for treatment, storage, or disposal any hazardous waste from an off-site source without an accompanying manifest, or without an accompanying shipping paper as described in R315-6-2.20(e), and if the waste is not excluded from the manifest requirements of R315, then the owner or operator shall prepare and submit a single copy of a report to the Board within 15 days after receiving the waste. These reports shall be designated "Unmanifested Waste Report" and include the following information:
(1) The EPA identification number, name, and address of the facility;
(2) The date the facility received the waste;
(3) The EPA identification number, name, and address of the generator and the transporter, if available;
(4) A description and the quantity of each unmanifested hazardous waste the facility received;
(5) The method of treatment, storage, or disposal for each hazardous waste;
(6) The certification signed by the owner or operator of the facility or his authorized representative; and
(7) A brief explanation of why the waste was unmanifested, if known.
12.8 ADDITIONAL REPORTS
In addition to the biennial and unmanifested waste reporting requirements described in R315-7-12.6, and R315-7-12.7, a facility owner or operator shall also report to the Board:
(a) Discharges, fires, and explosions as specified in R315-7-11.7(j);
(b) Groundwater contamination and monitoring data as specified in R315-7-13.4 and R315-7-13.5;
(c) Facility closure as specified in R315-7-14, which incorporates by reference 40 CFR 265.110 - 265.120;
(d) Upon its request, all information as the Board may deem necessary to determine compliance with the requirements of R315-7;
(e) As otherwise required by R315-7-26, which incorporates by reference 40 CFR 265.1030 - 265.1035, R315-7-27, which incorporate by reference 40 CFR 265 265.1050 - 265.1064 and R315-7-30, which incorporates by reference 40 CFR 265.1080 - 265.1091.
13.1 APPLICABILITY
(a) The owner or operator of a surface impoundment, landfill, or land treatment facility which is used to manage hazardous waste shall implement a groundwater monitoring program capable of determining the facility's impact on the quality of groundwater in the uppermost aquifer underlying the facility, except as R315-7-8.1 and R315-7-13.1(c) provide otherwise.
(b) Except as R315-7-13.1(c) and (d) provide otherwise, the owner or operator shall install, operate, and maintain a groundwater monitoring system which meets the requirements of R315-7-13.2, and shall comply with R315-7-13.3 - R315-7-13.5. This groundwater monitoring program shall be carried out during the active life of the facility, and for disposal facilities, during the post-closure care period as well.
(c) All or part of the groundwater monitoring sampling and analysis requirements of this section may be waived if the owner or operator can demonstrate that there is a low potential for migration of hazardous waste or hazardous waste constituents from the facility via the uppermost aquifer to water supply wells, domestic, industrial, or agricultural, or to surface water. This demonstration shall be in writing, and shall be kept at the facility. This demonstration shall be certified by a qualified geologist or geotechnical engineer and shall establish the following:
(1) The potential for migration of hazardous waste or hazardous waste constituents from the facility to the uppermost aquifer, by an evaluation of:
(i) A water balance of precipitation, evapotranspiration, run-off, and infiltration; and
(ii) Unsaturated zone characteristics, i.e., geologic materials, physical properties, and depth to groundwater; and
(2) The potential for hazardous waste or hazardous waste constituents which enter the uppermost aquifer to migrate to a water supply well or surface water, by an evaluation of:
(i) Saturated zone characteristics, i.e., geologic materials, physical properties, and rate of groundwater flow; and
(ii) The proximity of the facility to water supply wells or surface water.
(d) If an owner or operator assumes, or knows, that groundwater monitoring of indicator parameters in accordance with R315-7-13.2 and R315-7-13.3 would show statistically significant increases, or decreases in the case of pH, when evaluated under R315-7-13.4(b), he may install, operate, and maintain an alternate groundwater monitoring system, other than the one described in R315-7-13.2 and R315-7-13.3. If the owner or operator decides to use an alternate groundwater monitoring system he shall:
(1) Submit to the Board a specific plan, certified by a qualified geologist or geotechnical engineer, which satisfies the requirements of R315-7-13.4(d)(3) for an alternate groundwater monitoring system;
(2) Initiate the determinations specified in R315-7-13.4(d)(4);
(3) Prepare and submit a written report in accordance with R315-7-13.4(d)(5);
(4) Continue to make the determinations specified in R315-7-13.4(d)(4) on a quarterly basis until final closure of the facility; and
(5) Comply with the recordkeeping and reporting requirements in R315-7-13.5(d).
(e) The groundwater monitoring requirements of this section may be waived with respect to any surface impoundment that (1) is used to neutralize wastes which are hazardous solely because they exhibit the corrosivity characteristics under R315-2-9 or are listed as hazardous wastes in R315-2-10 only for this reason, and (2) contains no other hazardous wastes, if the owner or operator can demonstrate that there is no potential for migration of hazardous wastes from the impoundment. The demonstration must be established, based upon consideration of the characteristics of the wastes and the impoundment, that the corrosive wastes will be neutralized to the extent that they no longer meet the corrosivity characteristic before they can migrate out of the impoundment. The demonstration must be in writing and must be certified by a qualified professional.
(f) The Executive Secretary may replace all or part of the requirements of R315-7-13 applying to a regulated unit, as defined in R315-8-6, with alternative requirements developed for groundwater monitoring set out in an approved closure or post-closure plan or in an enforceable document, as defined in R315-3-1.1(e)(7), where the Executive Secretary determines that:
(1) A regulated unit is situated among solid waste management units, or areas of concern, a release has occurred, and both the regulated unit and one or more solid waste management unit(s), or areas of concern, are likely to have contributed to the release; and
(2) It is not necessary to apply the requirements of R315-7-13 because the alternative requirements will protect human health and the environment. The alternative standards for the regulated unit must meet the requirements of R315-8-6.12(a).
13.2 GROUNDWATER MONITORING SYSTEM
(a) A groundwater monitoring system shall be capable of yielding groundwater samples for analysis and shall consist of:
(1) Monitoring wells, at least one, installed hydraulically upgradient, i.e., in the direction of increasing static head from the limit of the waste management area. Their number, locations, and depths shall be sufficient to yield groundwater samples that are:
(i) Representative of background groundwater quality in the uppermost aquifer near the facility; and
(ii) Not affected by the facility.
(2) Monitoring wells, at least three, installed hydraulically downgradient, i.e., in the direction of decreasing static head, at the limit of the waste management area. Their number, locations, and depths shall ensure that they immediately detect any statistically significant amounts of hazardous waste or hazardous waste constituents that migrate from the waste management area to the uppermost aquifer.
(3) The facility owner or operator may demonstrate that an alternate hydraulically downgradient monitoring well location will meet the criteria outlined below. The demonstration must be in writing and kept at the facility. The demonstration must be certified by a qualified ground-water scientist and establish that:
(i) An existing physical obstacle prevents monitoring well installation at the hydraulically downgradient limit of the waste management area; and
(ii) The selected alternate downgradient location is as close to the limit of the waste management area as practical; and
(iii) The location ensures detection that, given the alternate location, is as early as possible of any statistically significant amounts of hazardous waste or hazardous waste constituents that migrate from the waste management area to the uppermost aquifer.
(iv) Lateral expansion, new, or replacement units are not eligible for an alternate downgradient location under this paragraph.
(b) Separate monitoring systems for each waste management component of the facility are not required provided that provisions for sampling upgradient and downgradient water quality will detect any discharge from the waste management area.
(1) In the case of a facility consisting of only one surface impoundment, landfill, or land treatment area, the waste management area is described by the waste boundary perimeter.
(2) In the case of a facility consisting of more than one surface impoundment, landfill, or land treatment area, the waste management area is described by an imaginary boundary line which circumscribes the several waste management components.
(c) All monitoring wells shall be cased in a manner that maintains the integrity of the monitoring well bore hole. This casing shall be screened or perforated, and packed with gravel or sand where necessary to enable sample collection at depths where appropriate aquifer flow zones exist. The annular space, i.e., the space between the bore hole and well casing above the sampling depth shall be sealed with a suitable material, e.g., cement grout or bentonite slurry, to prevent contamination of samples and the ground water.
13.3 SAMPLING AND ANALYSIS
(a) The owner or operator shall obtain and analyze samples from the installed groundwater monitoring system. The owner or operator shall develop and follow a groundwater sampling and analysis plan. He shall keep this plan at the facility. The plan shall include procedures and techniques for:
(1) Sample collection;
(2) Sample preservation and shipment;
(3) Analytical procedures; and
(4) Chain of custody control.
See "Procedures Manual for Groundwater Monitoring at Solid Waste Disposal Facilities," EPA-530/SW-611, August 1977 and "Methods for Chemical Analysis of Water and Wastes," EPA-600/4-79-020, March 1979 for discussions of sampling and analysis procedures.
(b) The owner or operator shall determine the concentration or value of the following parameters in groundwater samples in accordance with R315-7-13.3(c) and (d):
(1) Parameters characterizing the suitability of the groundwater as a drinking water supply, as specified in R315-50-3, which incorporates by reference 40 CFR 265, Appendix III.
(2) Parameters establishing groundwater quality:
(i) Chloride
(ii) Iron
(iii) Manganese
(iv) Phenols
(v) Sodium
(vi) Sulfate
These parameters are to be used as a basis for comparison in the event a groundwater quality assessment is required under R315-7-13.4(d).
(3) Parameters used as indicators of groundwater contamination:
(i) pH
(ii) Specific Conductance
(iii) Total Organic Carbon
(iv) Total Organic Halogen
(c)(1) For all monitoring wells, the owner or operator shall establish initial background concentrations or values of all parameters specified in R315-7-13.3(b). He shall do this quarterly for one year.
(2) For each of the indicator parameters specified in R315-7-13.3(b)(3), at least four replicate measurements shall be obtained for each sample and the initial background arithmetic mean and variance shall be determined by pooling the replicate measurements for the respective parameter concentrations or values in samples obtained from upgradient wells during the first year.
(d) After the first year, all monitoring wells shall be sampled and the samples analyzed with the following frequencies:
(1) Samples collected to establish groundwater quality shall be obtained and analyzed for the parameters specified in R315-7-13.3(b)(2) at least annually.
(2) Samples collected to indicate groundwater contamination shall be obtained and analyzed for the parameters specified in R315-7-13.3(b)(3) at least semiannually.
(e) Elevation of the groundwater surface at each monitoring well shall be determined each time a sample is obtained.
13.4 PREPARATION, EVALUATION, AND RESPONSE
(a) The owner or operator shall prepare an outline of a groundwater quality assessment program. The outline shall describe a more comprehensive groundwater monitoring program, than that described in R315-7-13.2 and R315-7- 13.3, capable of determining:
(1) Whether hazardous waste or hazardous waste constituents have entered the groundwater;
(2) The rate and extent of migration of hazardous waste or hazardous waste constituents in the groundwater; and
(3) The concentrations of hazardous waste or hazardous waste constituents in the groundwater.
(b) For each indicator parameter specified in R315-7-13.3(b)(3), the owner or operator shall calculate the arithmetic mean and variance, based on at least four replicate measurements on each sample, for each well monitored in accordance with R315-7-13.3(d)(2) and compare these results with its initial background arithmetic mean. The comparison shall consider individually each of the wells in the monitoring system, and shall use the Students t-test at the 0.01 level of significance, see R315-50-4, to determine statistically significant increases, and decreases, in the case of pH, over initial background.
(c)(1) If the comparisons for the upgradient wells made under R315-7-13.4(b) show a significant increase, or pH decrease, the owner or operator shall submit this information in accordance with R315-7-13.5(a)(2)(ii).
(2) If the comparisons for downgradient wells made under R315-7-13.4(b) show a significant increase, or pH decrease, the owner or operator shall then immediately obtain additional groundwater samples from those downgradient wells where a significant difference was detected, split the samples in two, and expeditiously obtain analyses of all additional samples to determine whether the significant difference was a result of laboratory error.
(d)(1) If the analyses performed under R315-7-13.4(c)(2) confirm the significant increase, or pH decrease, the owner or operator shall provide written notice to the Board--within seven days of the date of the confirmation--that the facility may be affecting groundwater quality.
(2) Within 15 days after the notification under R315-7-13.4(d)(1), the owner or operator shall develop and submit to the Board a specific plan, based on the outline required under R315-7-13.4(a) and certified by a qualified geologist or geotechnical engineer, for a groundwater quality assessment program at the facility.
(3) The plan to be submitted under R315-7-13.1(d)(1) or R315-7-13.4(d)(2) shall specify:
(i) The number, location, and depth of wells;
(ii) Sampling and analytical methods for those hazardous wastes or hazardous waste constituents in the facility;
(iii) Evaluation procedures, including any use of previously-gathered groundwater quality information; and
(iv) A schedule of implementation.
(4) The owner or operator shall implement the groundwater quality assessment plan which satisfies the requirements of R315-7-13.4(d)(3), and, at a minimum, determine:
(i) The rate and extent of migration of the hazardous waste or hazardous waste constituents in the groundwater; and
(ii) The concentrations of the hazardous waste or hazardous waste constituents in the groundwater.
(5) The owner or operator shall make his first determination under R315-7-13.4(d)(4) as soon as technically feasible, and, within 15 days after that determination submit to the Board a written report containing an assessment of the groundwater quality.
(6) If the owner or operator determines, based on the results of the first determination under R315- 7-13.4(d)(4), that no hazardous waste or hazardous waste constituents from the facility have entered the groundwater, then he may reinstate the indicator evaluation program described in R315-7-13.3 and R315-7-13.4(b). If the owner or operator reinstates the indicator evaluation program, he shall so notify the Board in the report submitted under R315-7- 13.4(d)(5).
(7) If the owner or operator determines, based on the first determination under R315-7-13.4(d)(4), that hazardous waste or hazardous waste constituents from the facility have entered the groundwater, then he:
(i) Must continue to make the determinations required under R315-7-13.4(d)(4) on a quarterly basis until final closure of the facility, if the groundwater quality assessment plan was implemented prior to final closure of the facility; or
(ii) May cease to make the determinations required under R315-7-13.4(d)(4), if the groundwater quality assessment plan was implemented during the post-closure care period.
(e) Notwithstanding any other provision of R315-7-13, any groundwater quality assessment to satisfy the requirements of R315-7-13.4(d)(4) which is initiated prior to final closure of the facility shall be completed and reported in accordance with R315-7-13.4(d)(5).
(f) Unless the groundwater is monitored to satisfy the requirements of R315-7-13.4(d)(4), at least annually the owner or operator shall evaluate the data on groundwater surface elevations obtained under R315-7-13.3(e) to determine whether the requirements under R315-7-13.2(a) for locating the monitoring wells continues to be satisfied. If the evaluation shows that R315-7-13.2(a) is no longer satisfied, the owner or operator shall immediately modify the number, location, or depth of the monitoring wells to bring the groundwater monitoring system into compliance with this requirement.
13.5 RECORDKEEPING AND REPORTING
(a) Unless the groundwater is monitored to satisfy the requirements of R315-7-13.4(d)(4), the owner or operator shall:
(1) Keep records of the analyses required in R315-7-13.3(c) and (d), the associated groundwater surface elevations required in R315-7-13.3(e), and the evaluations required in R315-7-13.4(b) throughout the active life of the facility, and, for disposal facilities, throughout the post-closure care period as well; and
(2) Report the following groundwater monitoring information to the Board:
(i) During the first year when initial background concentrations are being established for the facility: concentrations or values of the parameters listed in R315-7-13.3(b)(1) for each groundwater monitoring well within 15 days after completing each quarterly analysis. The owner or operator shall separately identify for each monitoring well any parameters whose concentration or value has been found to exceed the maximum contaminant levels listed in 40 CFR 265, Appendix III.
(ii) Annually: concentrations or values of the parameters listed in R315-7-13.3(b)(3) for each groundwater monitoring well, along with the required evaluations for these parameters under R315-7-13.4(b). The owner or operator shall separately identify any significant differences from initial background found in the upgradient wells, in accordance with R315-7-13.4(c)(1). During the active life of the facility, this information shall be submitted no later than March 1 following each calendar year.
(iii) No later than March 1 following each calendar year: results of the evaluation of groundwater surface elevations under R315-7-13.4(f), and a description of the response to that evaluation, where applicable.
(b) If the groundwater is monitored to satisfy the requirements of R315-7-13.4(d)(4), the owner or operator shall:
(1) Keep records of the analyses and evaluations specified in the plan, which satisfies the requirements of R315-7-13.4(d)(3), throughout the active life of the facility, and, for disposal facilities, throughout the post-closure care period as well; and
(2) Annually, until final closure of the facility, submit to the Board a report containing the results of his groundwater quality assessment program which includes, but is not limited to, the calculated (or measured) rate of migration of hazardous waste or hazardous waste constituents in the groundwater during the reporting period. This report shall be submitted no later than March 1, following each calendar year.
The requirements as found in 40 CFR 265 subpart G (265.110 - 265.121), 1998 ed., as amended by 63 FR 56710, October 22, 1998, are adopted and incorporated by reference with the following exceptions:
(a) Substitute "Board" for all references to "Administrator" or "Regional Administrator".
(b) Substitute the word "appointee" for "employee."
(c) Substitute "Board" for "Agency."
(d) Substitute 19-6 for references to RCRA.
The requirements as found in 40 CFR 265 subpart H (265.140 - 265.150), 1998 ed., as amended by 63 FR 56710, October 22, 1998, are adopted and incorporated by reference with the following exceptions:
(a) substitute "Executive Secretary" for all references to "Administrator" or "Regional Administrator."
(b) substitute "Board" for all references to "Agency" or "EPA".
(c) substitute "The Utah Solid and Hazardous Waste Act" for all references to "the Resource Conservation and Recovery Act" or "RCRA."
16.1 APPLICABILITY
The rules in this section apply to the owners or operators of all hazardous waste management facilities that store containers of hazardous waste, except as provided otherwise in R315-7-8.1.
16.2 CONDITION OF CONTAINERS
The container holding hazardous waste shall be in good condition and shall not leak. If a container is not in good condition, or if it begins to leak, the owner or operator shall transfer the hazardous waste from the container to a storage container that is in good condition, or manage the waste in another fashion which complies with the requirements of R315-7.
16.3 COMPATIBILITY OF WASTE WITH CONTAINER
Owners or operators shall use containers made of or lined with materials which will not react with, and are otherwise compatible with, the waste to be stored, so that the ability of the container to contain the waste is not impaired.
16.4 MANAGEMENT OF CONTAINERS
(a) A container holding hazardous waste shall always be closed during storage, except when it is necessary to add or remove waste.
(b) A container holding hazardous waste shall not be opened, handled, or stored in a manner which may rupture the container or cause it to leak.
Reuse of containers is also governed by the U.S. Department of Transportation regulations, including those set forth in 49 CFR 173.28.
16.5 INSPECTIONS
In addition to the inspections required by R315-7-9.6, the owner or operator shall inspect areas where containers are stored, at least weekly, looking for leaks and for deterioration caused by corrosion or other factors. See R315-7-16.2 for remedial action required if deterioration or leaks are detected.
16.6 SPECIAL REQUIREMENTS FOR IGNITABLE OR REACTIVE WASTE
Containers holding ignitable or reactive waste shall be located more than 15 meters, 50 feet, from the facility's property line.
See R315-7-9.8 for additional requirements.
16.7 SPECIAL REQUIREMENTS FOR INCOMPATIBLE WASTE
(a) Incompatible wastes or incompatible wastes and materials, see 40 CFR 265, Appendix V for examples, shall not be placed in the same container, unless R315-79.8(b) is complied with.
(b) Hazardous waste shall not be placed in an unwashed container that previously held an incompatible waste or material, see 40 CFR 265, Appendix V for examples, unless R315-7-9.8(b) is complied with.
(c) A storage container holding a hazardous waste that is incompatible with any waste or other materials stored nearby in other containers, open tanks, piles, or surface impoundments shall be separated from the other materials or protected from them by means of a dike, berm, wall, or other device. The purpose of this is to prevent fires, explosions, gaseous emissions, leaching, or other discharge of hazardous wastes or hazardous constituents which could result from the mixing of incompatible materials.
16.8 AIR EMISSION STANDARDS
The owner or operator shall manage all hazardous waste placed in a container in accordance with the applicable requirements of R315-7-26, which incorporates by reference 40 CFR subpart AA, R315-7-27, which incorporates by reference 40 CFR subpart BB, and R315-7-30, which incorporates by reference 40 CFR subpart CC.
The requirements as found in 40 CFR 265 subpart J, 265.190-265.202, 1996 ed., as amended by 61 FR 59931, November 25, 1996, are adopted and incorporated by reference with the following exceptions:
(a) Substitute "Executive Secretary" for all references to "Regional Administrator" found in 40 CFR 265 subpart J with the exception of 40 CFR 265.193(g) and (h)(5), which will replace "Regional Administrator" with "Board".
(b) Add, following January 12, 1988, in 40 CFR 265.191(a), "or by December 16, 1988, for non-HSWA existing tank systems."
(c) Replace 40 CFR 265.193(a)(2) to (4) with the following corresponding paragraphs:
(1) For all HSWA existing tank systems used to store or treat EPA Hazardous Waste Nos. F020, F021, F022, F023, F026, and F027, within two years after January 12, 1987, or within two years after December 16, 1988, for non- HSWA existing tank systems;
(2) For those HSWA existing tank systems of known and documented age, within two years after January 12, 1987, or within two years after December 16, 1988, for non-HSWA existing tank systems, or when the tank system has reached 15 years of age, whichever comes later;
(3) For those HSWA existing tank systems for which the age cannot be documented, within eight years of January 12, 1987, or within eight years of December 16, 1988, for non-HSWA existing tank systems; but if the age of the facility is greater than seven years, secondary containment must be provided by the time the facility reaches 15 years of age, or within two years of January 12, 1987, or within two years of December 16, 1988, for non-HSWA existing tank systems, whichever comes later; and
(d) Add, following the last January 12, 1987, in 40 CFR 265.193(a)(5), "or December 16, 1988, for non-HSWA tank systems."
18.1 APPLICABILITY
The rules in this section apply to the owners and operators of facilities that use surface impoundments for the treatment, storage, or disposal of hazardous waste, except as provided otherwise in R315-7-8.1.
18.2 ACTION LEAKAGE RATE
(a) The owner or operator of surface impoundment units subject to R315-7-18.9(a) must submit a proposed action leakage rate to the Executive Secretary when submitting the notice required under R315-7-18.9(b). Within 60 days of receipt of the notification, the Executive Secretary will: Establish an action leakage rate, either as proposed by the owner or operator or modified using the criteria in this section; or extend the review period for up to 30 days. If no action is taken by the Executive Secretary before the original 60 or extended 90 day review periods, the action leakage rate will be approved as proposed by the owner or operator.
(b) The Executive Secretary shall approve an action leakage rate for surface impoundment units subject to R315-7-18.9(a). The action leakage rate is the maximum design flow rate that the leak detection system, LDS, can remove without the fluid head on the bottom liner exceeding one foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design, e.g., slope, hydraulic conductivity, thickness of drainage material, construction, operation, and location of the LDS, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the LDS, and proposed response actions, e.g., the action leakage rate shall consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.
(c) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly or monthly flow rate from the monitoring data obtained under R315-7-18.5(b), to an average daily flow rate, gallons per acre per day, for each sump. Unless the Executive Secretary approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period, and if the unit closes in accordance with R315-7-18.6, which incorporates by reference 40 CFR 265.228(a)(2), monthly during the post-closure care period when monthly monitoring is required under R315-7-18.5(b).
18.3 CONTAINMENT SYSTEM
All earthen dikes shall have a protective cover, such as grass, shale, or rock, to minimize wind and water erosion and to preserve their structural integrity.
18.4 WASTE ANALYSIS AND TRIAL TESTS
In addition to the waste analyses required by R315-7-9.4, which incorporates by reference 40 CFR 265.13, whenever a surface impoundment is used to:
(1) Chemically treat a hazardous waste which is substantially different from waste previously treated in that impoundment; or
(2) Chemically treat hazardous waste with a substantially different process than any previously used in that impoundment; the owner or operator shall, before treating the different waste or using the different process:
(i) Conduct waste analyses and trial treatment tests, e.g., bench scale or pilot plant scale tests; or
(ii) Obtain written, documented information on similar treatment of similar waste under similar operating conditions; to show that this treatment will comply with R315-7-9.8(b).
The owner or operator shall record the results from each waste analysis and trial test in the operating record of the facility, see R315-7-12.4, which incorporates by reference 40 CFR 265.73.
18.5 MONITORING AND INSPECTIONS
(a) The owner or operator shall inspect:
(1) The freeboard level at least once each operating day to ensure compliance with R315-7-18.2, and
(2) The surface impoundment, including dikes and vegetation surrounding the dike, at least once a week to detect any leads, deterioration, or failures in the impoundment.
(b)(1) An owner or operator required to have a leak detection system under R315-7-18.9(a) shall record the amount of liquids removed from each leak detection system sump at least once each week during the active life and closure period.
(2) After the final cover is installed, the amount of liquids removed from each leak detection system sump shall be recorded at least monthly. If the liquid level in the sump stays below the pump operating level for two consecutive months, the amount of liquids in the sumps shall be recorded at least quarterly. If the liquid level in the sump stays below the pump operating level for two consecutive quarters, the amount of liquids in the sumps shall be recorded at least semi-annually. If at any time during the post-closure care period the pump operating level is exceeded at units on quarterly or semi-annual recording schedules, the owner or operator shall return to monthly recording of amounts of liquids removed from each sump until the liquid level again stays below the pump operating level for two consecutive months.
(3) "Pump operating level" is a liquid level proposed by the owner or operator and approved by the Executive Secretary based on pump activation level, sump dimensions, and level that avoids backup into the drainage layer and minimizes head in the sump. The timing for submission and approval of the proposed "pump operating level" will be in accordance with R315-7-18.2(a).
The owner or operator shall remedy any deterioration or malfunction he finds.
18.6 CLOSURE AND POST-CLOSURE
The requirements as found in 40 CFR 265.228, 1992 ed., are adopted and incorporated by reference.
18.7 SPECIAL REQUIREMENTS FOR IGNITABLE OR REACTIVE WASTE
Ignitable or reactive waste shall not be placed in a surface impoundment, unless the waste and impoundment satisfy all applicable requirements of R315-13, which incorporates by reference 40 CFR 268, and:
(a) The waste is treated, rendered, or mixed before or immediately after placement in the impoundment so that:
(1) The resulting waste, mixture, or dissolution of material no longer meets the definition of ignitable or reactive waste under R315-2-9(d) and (f); and
(2) R315-7-9.8(b) is complied with; or
(b)(1) The waste is managed in such a way that it is protected from any material or conditions which may cause it to ignite or react; and
(2) Maintain and monitor the leak detection system in accordance with R315-8-11.2(c)(2)(iv) and (3) and R315-7-18.5(b) and comply with all other applicable leak detection system requirements of R315-7;
(3) The owner or operator obtains a certification from a qualified chemist or engineer that, to the best of his knowledge and opinion, the design features or operating plans of the facility will prevent ignition or reaction; and
(4) The certification and the basis for it are maintained at the facility; or
(c) The surface impoundment is used solely for emergencies.
18.8 SPECIAL REQUIREMENTS FOR INCOMPATIBLE WASTES
Incompatible wastes or incompatible wastes and materials, see 40 CFR 265, Appendix V for examples, shall not be placed in the same surface impoundment, unless they will not generate heat, fumes, fires, or explosive reactions that could damage the structural integrity of the impoundment, or otherwise threaten human health or the environment.
18.9 DESIGN REQUIREMENTS
(a) The owner or operator of each new surface impoundment unit on which construction commences after January 29, 1992, each lateral expansion of a surface impoundment unit on which construction commences after July 29, 1992, and each replacement of an existing surface impoundment unit that is to commence reuse after July 29, 1992 must install two or more liners and a leachate collection and removal system between such liners, and operate the leachate collection and removal system, in accordance with R315-7-18.9(c), unless exempted under R315-7-18.9(d), (e), or (f). "Construction commences" is as defined in R315-1-1(b), which incorporates by reference 40 CFR 260.10, under "existing facility."
(b) The owner or operator of each unit referred to in paragraph (a) of this section shall notify the Board at least 60 days prior to receiving waste. The owner or operator of each facility submitting notice must file a part B application within six months of the receipt of the notice.
(c) The owner or operator of any replacement surface impoundment unit is exempt from R315-7-18.9(a) if:
(1) The existing unit was constructed in compliance with the design standards of Section 3004(o)(1)(A)(i) and (o)(5) of the Resource Conservation and Recovery Act; and
(2) There is no reason to believe that the liner is not functioning as designed.
(d) The double liner requirement set forth in R315-7-18.9(a) may be waived by the Board for any monofill, if;
(1) The monofill contains only hazardous wastes from foundry furnace emission controls or metal casting molding sand, and these wastes do not contain constituents which would render the wastes hazardous for reasons other than the Toxicity Characteristic in R315-2-9(g) with EPA Hazardous Waste Numbers D004 through D017; and
(2)(i)(A) The monofill has at least one liner for which there is no evidence that the liner is leaking. For the purposes of this paragraph the term "liner" means a liner designed, constructed, installed, and operated to prevent hazardous waste from passing into the liner at any time during the active life of the facility, or a liner designed, constructed, installed, and operated to prevent hazardous waste from migrating beyond the liner to adjacent subsurface soil, groundwater, or surface water at any time during the active life of the facility. In the case of any surface impoundment which has been exempted from the requirements of R315-7-18.9(a) on the basis of a liner designed, constructed, installed, and operated to prevent hazardous waste from passing beyond the liner, at the closure of the impoundment the owner or operator must remove or decontaminate all waste residues, all contaminated liner material, and contaminated soil to the extent practicable given the specific site conditions and the nature and extent of contamination. If all contaminated soil is not removed or decontaminated, the owner or operator of the impoundment must comply with appropriate post-closure requirements, including but not limited to groundwater monitoring and corrective action.
(B) The monofill is located more than one-quarter mile from an underground source of drinking water, as that term is defined in 40 CFR; 144.3; and
(C) The monofill is in compliance with applicable groundwater monitoring requirements for facilities with permits; or
(ii) The owner or operator demonstrates that the monofill is located, designed and operated so as to assure that there will be no migration of any hazardous constituent into groundwater or surface water at any future time.
(e) In the case of any unit in which the liner and leachate collection system has been installed pursuant to the requirements of R315-7-18.9(a) and in good faith compliance with R315-7-18.9(a) and with guidance documents governing liners and leachate collection systems under R315-7-18.9(a), no liner or leachate collection system which is different from that which was so installed pursuant to R315-7-18.9(a) will be required for the unit by the Board when issuing the first permit to the facility, except that the Board will not be precluded from requiring installation of a new liner when the Board has reason to believe that any liner installed pursuant to the requirements of R315-7-18.9(a) is leaking.
(f) A surface impoundment shall maintain enough freeboard to prevent overtopping of the dike by overfilling, wave action, or a storm. Except as provided in R315-7-18.2(b), there shall be at least 60 centimeters, two feet, of freeboard.
(g) A freeboard level less than 60 centimeters, two feet, shall be maintained if the owner or operator obtains certification by a qualified engineer that alternate design features or operating plans will, to the best of his knowledge and opinion, prevent overtopping of the dike. The certification, along with written identification of alternate design features or operating plans preventing overtopping, shall be maintained at the facility.
(h) Surface impoundments that are newly subject to R315-7-18 due to the promulgation of additional listings or characteristics for the identification of hazardous waste must be in compliance with R315-7-18.9(a), (c) and (d) not later than 48 months after the promulgation of the additional listing or characteristic. This compliance period shall not be cut short as the result of the promulgation of land disposal prohibitions under R315-13, which incorporates by Reference 40 CFR 268, or the granting of an extension to the effective date of a prohibition pursuant to 40 CFR 268.5, within this 48-month period.
18.10 RESPONSE ACTIONS
(a) The owner or operator of surface impoundment units subject to R315-7-18.9(a) shall submit a response action plan to the Executive Secretary when submitting the proposed action leakage rate under R315-7-18.2. The response action plan shall set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in R315-7-18.10(b).
(b) If the flow rate into the leak detection system exceeds the action leakage rate for any sump, the owner or operator shall:
(1) Notify the Executive Secretary in writing of the exceedence within seven days of the determination;
(2) Submit a preliminary written assessment to the Executive Secretary within 14 days of the determination, as to the amount of liquids, likely sources of liquids, possible location, size, and cause of any leaks, and short-term actions taken and planned;
(3) Determine to the extent practicable the location, size, and cause of any leak;
(4) Determine whether waste receipt should cease or be curtailed, whether any waste should be removed from the unit for inspection, repairs, or controls, and whether or not the unit should be closed;
(5) Determine any other short-term and longer-term actions to be taken to mitigate or stop any leaks; and
(6) Within 30 days after the notification that the action leakage rate has been exceeded, submit to the Executive Secretary the results of the analyses specified in R315-7-18.10(b)(3)-(5), the results of actions taken, and actions planned. Monthly thereafter, as long as the flow rate in the leak detection system exceeds the action leakage rate, the owner or operator must submit to the Executive Secretary a report summarizing the results of any remedial actions taken and actions planned.
(c) To make the leak and/or remediation determinations in R315-7-18.10(b)(3)-(5), the owner or operator shall:
(1)(i) Assess the source of liquids and amounts of liquids by source,
(ii) Conduct a fingerprint, hazardous constituent, or other analyses of the liquids in the leak detection system to identify the source of liquids and possible location of any leaks, and the hazard and mobility of the liquid; and
(iii) Assess the seriousness of any leaks in terms of potential for escaping into the environment; or
(2) Document why such assessments are not needed.
18.11 AIR EMISSION STANDARDS
The owner or operator shall manage all hazardous waste placed in a surface impoundment in accordance with the applicable requirements of R315-7-27, which incorporates by reference 40 CFR subpart BB, and R315-7-30, which incorporates by reference 40 CFR subpart CC.
19.1 APPLICABILITY
The rules in this section apply to the owners and operators of facilities that treat or store hazardous waste in piles, except as provided otherwise in R315-7-8.1. Alternatively, a pile of hazardous waste may be managed as a landfill under R315-7-21.
19.2 PROTECTION FROM WIND
The owners or operators of a pile containing hazardous waste which could be subject to dispersal by wind shall cover or otherwise manage the pile so that the wind dispersal is controlled.
19.3 WASTE ANALYSIS
In addition to the waste analyses required by R315-7-9.4, owners or operators shall analyze a representative sample from each incoming shipment of waste before adding the waste to any existing pile, unless the only wastes the facility receives which are amenable to piling are compatible with each other, or the waste received is compatible with the waste in the pile to which it is to be added. The analysis conducted shall be capable of differentiating between the types of hazardous waste which are placed in piles, so that mixing of incompatible waste does not inadvertently occur. The analysis shall include a visual comparison of color and texture. The results of these analyses shall be placed in the operating record.
19.4 CONTAINMENT
If leachate or run-off from a pile is a hazardous waste, then either:
(a)(1) The pile shall be placed on an impermeable base that is compatible with the waste under the conditions of treatment or storage;
(2) The owner or operator shall design, construct, operate, and maintain a run-on control system capable of preventing flow onto the active portion of the pile during peak discharge from at least a 25-year storm;
(3) The owner or operator shall design, construct, operate, and maintain a run-off management system to collect and control at least the water volume resulting from a 24-hour, 25-year storm; and
(4) Collection and holding facilities, e.g., tanks or basins, associated with run-on and run-off control systems shall be emptied or otherwise managed expeditiously to maintain design capacity of the system; or
(b)(1) The pile shall be protected from precipitation and run-on by some other means; and
(2) No liquids or wastes containing free liquids may be placed in the pile.
19.5 SPECIAL REQUIREMENTS FOR IGNITABLE WASTE
Ignitable waste shall not be placed in a pile unless the waste and waste pile satisfy all applicable requirements of R315-13, which incorporates by reference 40 CFR 268, and:
(a) Addition of the waste to an existing pile results in the waste or mixture no longer meeting the definition of ignitable waste under R315-2-9(d), and complies with R315-7-9.8; or
(b) The waste is managed in such a way that it is protected from any material or conditions which may cause it to react.
19.6 REQUIREMENTS FOR REACTIVE WASTE
Reactive waste shall not be placed in a pile unless the waste and pile satisfy all applicable requirements of R315-13, which incorporates by reference 40 CFR 268, and:
(a) Addition of the waste to an existing pile results in the waste or mixture no longer meeting the definition of reactive waste under R315-2-9(f) and complies with R315-7-9.8; or
(b) The waste is managed in such a way that it is protected from any material or condition which may cause it to react.
19.7 SPECIAL REQUIREMENTS FOR INCOMPATIBLE WASTE
(a) Incompatible waste, or incompatible wastes and materials, see 40 CFR 265, Appendix V for examples, shall not be placed in the same pile unless, R315-7-9.8(b) is complied with.
(b) A pile of hazardous waste that is incompatible with any waste or other material stored nearby in other containers, piles, open tanks, or surface impoundments shall be separated from the other materials, or protected from them by means of a dike, berm, wall, or other device. The purpose of this is to prevent gaseous emissions, fires, explosions, leaching or other discharge of hazardous waste or hazardous waste constituents which could result from the contact or mixing of incompatible wastes or materials.
(c) Hazardous waste shall not be piled on the same area where incompatible wastes or materials were previously piled, unless that area has been decontaminated sufficiently to ensure compliance with R315-7-9.8(b).
19.8 CLOSURE AND POST-CLOSURE CARE
(a) At closure, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components, liners, etc., contaminated subsoils, and structures and equipment contaminated with waste and leachate, and manage them as hazardous waste unless R315-2-3(d) applies; or
(b) If, after removing or decontaminating all residues and making all reasonable efforts to effect removal or decontamination of contaminated components, subsoils, structures, and equipment as required in R315-7-19.8(a), the owner or operator finds that not all contaminated subsoils can be practicably removed or decontaminated, he shall close the facility and perform post-closure care in accordance with the closure and post-closure requirements that apply to landfills, R315-7-21.4.
19.9 DESIGN AND OPERATING REQUIREMENTS
The owner or operator of each new waste pile on which construction commences after January 29, 1992, each lateral expansion of a waste pile unit on which construction commences after July 29, 1992, and each such replacement of an existing waste pile unit that is to commence reuse after July 29, 1992 shall install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal systems, in accordance with R315-8-12.2(c), unless exempted under R315-8-12.2(d), (e), or (f); and must comply with the procedures of R315-7-18.9(b). "Construction commences" is as defined in R315-1-1(b), which incorporates by reference 40 CFR 260.10, under "existing facility".
19.10 ACTION LEAKAGE RATES
(a) The owner or operator of waste pile units subject to R315-7-19.9 shall submit a proposed action leakage rate to the Executive Secretary when submitting the notice required under R315-7-19.9. Within 60 days of receipt of the notification, the Executive Secretary will: Establish an action leakage rate, either as proposed by the owner or operator or modified using the criteria in this section; or extend the review period for up to 30 days. If no action is taken by the Executive Secretary before the original 60 or extended 90 day review periods, the action leakage rate will be approved as proposed by the owner or operator.
(b) The Executive Secretary shall approve an action leakage rate for surface impoundment units subject to R315-7-19.9. The action leakage rate is the maximum design flow rate that the leak detection system, LDS, can remove without the fluid head on the bottom liner exceeding one foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design, e.g., slope, hydraulic conductivity, thickness of drainage material, construction, operation, and location of the LDS, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the LDS, and proposed response actions, e.g., the action leakage rate shall consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.
(c) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly flow rate from the monitoring data obtained under R315-7-19.12, to an average daily flow rate, gallons per acre per day, for each sump. Unless the Executive Secretary approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period.
19.11 RESPONSE ACTIONS
(a) The owner or operator of waste pile units subject to R315-7-19.9 shall submit a response action plan to the Executive Secretary when submitting the proposed action leakage rate under R315-7-19.10. The response action plan shall set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan shall describe the actions specified in R315-7-19.11(b).
(b) If the flow rate into the leak determination system exceeds the action leakage rate for any sump, the owner or operator shall:
(1) Notify the Executive Secretary in writing of the exceedence within seven days of the determination;
(2) Submit a preliminary written assessment to the Executive Secretary within 14 days of the determination, as to the amount of liquids, likely sources of liquids, possible location, size, and cause of any leaks, and short-term actions taken and planned;
(3) Determine to the extent practicable the location, size, and cause of any leak;
(4) Determine whether waste receipts should cease or be curtailed, whether any waste should be removed from the unit for inspection, repairs, or controls, and whether or not the unit should be closed;
(5) Determine any other short-term and longer-term actions to be taken to mitigate or stop any leaks; and
(6) Within 30 days after the notification that the action leakage rate has been exceeded, submit to the Executive Secretary the results of the analyses specified in R315-7-19.11(b)(3)-(5), the results of actions taken, and actions planned. Monthly thereafter, as long as the flow rate in the leak detection system exceeds the action leakage rate, the owner or operator shall submit to the Executive Secretary a report summarizing the results of any remedial actions taken and actions planned.
(c) To make the leak and/or remediation determinations in R315-7-19.11(b)(3)-(5), the owner or operator shall:
(1)(i) Assess the source of liquids and amounts of liquids by source,
(ii) Conduct a fingerprint, hazardous constituent, or other analyses of the liquids in the leak detection system to identify the source of liquids and possible location of any leaks, and the hazard and mobility of the liquid; and
(iii) Assess the seriousness of any leaks in terms of potential for escaping into the environment; or
(2) Document why such assessments are not needed.
19.12 MONITORING AND INSPECTION
An owner or operator required to have a leak detection system under R315-7-19.9 shall record the amount of liquids removed from each leak detection system sump at least once each week during the active life and closure period.
20.1 APPLICABILITY
The rules in this section apply to owners and operators of hazardous waste land treatment facilities, except as provided otherwise in R315-7-8.1.
20.2 GENERAL OPERATING REQUIREMENTS
(a) Hazardous waste shall not be placed in or on a land treatment facility unless the waste can be made less hazardous or non-hazardous by degradation, transformation, or immobilization processes occurring in or on the soil.
(b) The owner or operator shall design, construct, operate, and maintain a run-on control system capable of preventing flow onto the active portions of the facility during peak discharge from at least a 25-year storm.
(c) The owner or operator shall design, construct, operate, and maintain a run-off management system capable of collecting and controlling a water volume at least equivalent to a 24-hour, 25-year storm.
(d) Collection and holding facilities, e.g., tanks or basins, associated with run-on and run-off control systems shall be emptied or otherwise managed expeditiously after storms to maintain design capacity of the system.
(e) If the treatment zone contains particulate matter which may be subject to wind dispersal, the owner or operator shall manage the unit to control wind dispersal.
20.3 WASTE ANALYSIS
In addition to the waste analyses required by R315-7-9.4, before placing a hazardous waste in or on a land treatment facility, the owner or operator shall:
(a) Determine the concentration in the waste of any substances which equal or exceed the maximum concentrations contained in Table 1 of 40 CFR 261.24, that cause a waste to exhibit the Toxicity Characteristic;
(b) For any waste listed in R315-2, determine the concentration of any substances which caused the waste to be listed as a hazardous waste; and
(c) If food chain crops are grown, determine the concentrations in the waste of each of the following constituents: arsenic, cadmium, lead, and mercury, unless the owner or operator has written documented data that show that the constituent is not present;
R315-50-9, which incorporates by reference 40 CFR 261, Appendix VII, specifies the substances for which a waste is listed as a hazardous waste. As required by R315-7-9.4, the waste analysis plan shall include analyses needed to comply with R315-7-20.8 and R315-7-20.9. As required by R315-7-12.4, the owner or operator shall place the results from each waste analysis, or the documented information, in the operating record of the facility.
20.4 FOOD CHAIN CROPS
(a) An owner or operator of a hazardous waste land treatment facility on which food chain crops are being grown, or have been grown and will be grown in the future, shall notify the Board. The growth of food chain crops at a facility which has never before been used for this purpose is a significant change in process under R315-3. Owners or operators of these land treatment facilities who propose to grow food chain crops shall comply with R315-3.
(b)(1) Food chain crops shall not be grown on the treated area of a hazardous waste land treatment facility unless the owner or operator can demonstrate, based on field testing, that any arsenic, lead, mercury, or other constituents identified under R315-7-20.3(b):
(i) Will not be transferred to the food portion of the crop by plant uptake or direct contact, and will not otherwise be ingested by food chain animals, e.g., by grazing; or
(ii) Will not occur in greater